✦ Design → Build → Show Floor

Our Trade Show Booth Process

From “We have a show coming up” to “Wow — we’re ready.” One connected team takes your exhibit from an empty booth space to a completely show-ready brand experience.

Since 2015

Helping brands own the show floor

10,000+

Booths built across booth sizes, industries & convention cities

One Purple Pro

Dedicated Purple Pro who stays connected to your entire project

Nationwide

Full-service process — design, fabrication, graphics & logistics together

The Purple Process at a Glance

Step 01

Discover & Define

First, we listen. Before we draw a wall or add a screen, we need to understand why you’re exhibiting — launching a product, entering a new market, or preparing for the most important event on your calendar. The booth is designed around your goals, not a generic package.
Step 02

Design the Experience

This is where an empty floor starts becoming your brand. We plan a floor layout that supports how the booth needs to work — entrances, product zones, meeting rooms and storage — then build the visual experience: architectural shapes, dimensional logos, lighting and LED features.
Step 03

Plan, Price & Approve

The creative idea becomes a clear project plan. We connect the visual concept to the actual scope, materials, services and investment — and clearly separate Purple’s services from venue, contractor or union charges.
Step 04

Produce & Coordinate

Now the rendering starts becoming real. Approved drawings, materials, graphics and technology transform into physical booth components, while behind the scenes we coordinate everything the venue requires.
Step 05

Stage, Test & Ship

Before show-floor pressure begins, we look for avoidable problems. Whenever practical, key components are assembled and reviewed before shipping — the walls stand, the graphics install, the lights turn on.
Step 06

Install, Show Up & Wrap Up

The crates arrive. The crew begins. Inside a busy, deadline-driven show floor, the installation team works from approved plans — and before doors open, graphics, lighting, furniture and presentation get one final walkthrough.
Planning window

How long does it take?

The earlier we begin, the more options you have. The time needed to design, build and deliver a trade show exhibit depends on a number of factors — a smaller rental exhibit may require less preparation than a large custom island booth with extensive fabrication, technology and overhead elements.

Booth Size

Design Complexity

Custom Fabrication

Graphic Requirements

Materials

Engineering

LED and AV

Venue Approvals

Client Approval Timing

Show-Service Deadlines

Shipping Distance

Production Availability

What You Handle vs. What Purple Handles

A smooth process works best when everyone understands their part. You know your brand. We know how to get it onto the show floor.

The Brand & The Decisions

The Moving Pieces

The Purple Process at a Glance

Clear

You understand where the project stands and what happens next.

Connected

Design, production, logistics and installation work toward the same result.

Personal

One Purple Pro remains connected to your project.

Creative

The exhibit is developed around your brand, audience and goals.

Practical

Creative decisions are considered alongside budget, production and venue realities.

Proactive

We look for important questions before they become urgent problems.

Flexible

The process adjusts to your booth size, schedule, city and required services.

Purple

Big ideas. Calm execution. People who care.

From empty space to show-ready.

Discover

Understand it.

Design

Create it.

Plan

Scope it.

Produce

Build it.

Prepare

Pack it.

Deliver

Show it.

Have a Purple Moment.

The installation is complete. The graphics are smooth, the lights are on, and the screens are playing. The floor is clean, the furniture is exactly where it belongs, and your team is ready to step into the booth. The show floor is about to open, and for the first time in weeks, there is no last-minute setup to worry about.
We’ll take care of the rest. 💜

Frequently Asked Questions

What is the trade show booth design and build process?
The trade show booth design and build process generally includes discovery, exhibit design, budgeting, approvals, fabrication, graphic production, show-service coordination, pre-show quality control, shipping, installation, dismantle and storage. Purple connects these stages through one dedicated project team.
Begin by sharing your company name, website, show name, event dates, city, booth size, budget range and goals. Brand guidelines, floor plans, previous booth photos and design inspiration are also helpful.
Timing depends on the booth size, creative complexity, fabrication, graphics, technology, venue requirements and approval schedule. Starting early provides more options and additional time for careful production and logistics planning.
Yes. Depending on the project, Purple creates 3D trade show booth renderings that help clients review the layout, branding, materials, features, furniture, lighting and overall experience before production.
Yes. Purple works collaboratively with clients to refine the booth based on brand requirements, functionality, budget and show-floor goals. Revision terms may depend on the agreed project scope.
Yes. Purple can review relevant booth rules and exhibitor information, including height restrictions, setbacks, hanging signs, freight dates and other requirements that may affect the project.
Depending on the approved scope, Purple may help track deadlines and coordinate services such as electrical, internet, rigging, labor, freight and other venue requirements.
Yes. Purple designs and produces custom trade show exhibits based on the company’s brand, goals, booth size, venue rules, timeline and budget.
Yes. Purple offers customizable rental exhibits for companies that need flexibility, different booth sizes or an efficient solution for specific trade shows.
Yes. Purple can coordinate exhibit graphics such as SEG fabric graphics, wall panels, light-box graphics, signage, dimensional logos and other branded elements included in the project.
Yes. Depending on the project, Purple can integrate LED walls, monitors, lighting, sound and other AV technology into the booth design and installation plan.
Yes. Purple can coordinate exhibit transportation to an advance warehouse, convention center, local warehouse, storage location or another event based on the schedule and approved scope.
An advance warehouse is a receiving facility that accepts exhibit freight before the official event move-in. The show contractor later transports the shipment from the warehouse to the booth space.
Drayage, also called material handling, generally covers moving exhibit freight from the receiving location to the booth, storing empty crates during the event and returning the packed shipment after dismantle.
Yes. Purple’s own crews install and dismantle your exhibit nationwide, working within each venue’s labor rules and with its official service providers.
×

Is a Custom Exhibit Right for me?

Let’s get right on that answer for you: