| Rule book used | 2026 Show Rules & Regulations; the 2029 manual is not posted yet | 2027 Booth Specifications | 2027 Rules and Regulations | 2025 Rules & Regulations; 2027 rules are not posted yet | 2027 Rules and Regulations, plus the Morial Convention Center's exhibitor policies | 2024 Las Vegas display rules; the 2028 manual is not posted yet |
|---|
| Tallest build | Islands, peninsulas and corner or perimeter spaces 20 ft deep or more: structures and signs to 16 ft, machinery height unlimited, machines 6 in off every aisle (2026 rules) Source ↗ | Islands of 20×20 and up: displays and hanging signs to 26 ft where the ceiling permits; equipment and product height unlimited (2027 specs) Source ↗ | 20 ft deep and 400 sq ft or more: corners and perimeters 15 ft, peninsulas and islands 20 ft; product unlimited (2027 rules) Source ↗ | Under 20 ft deep: 10 ft; corners and perimeters 20 ft deep: 15 ft; peninsulas and islands: 20 ft; machinery unlimited; towers over 12 ft need stamped drawings (2025 rules). Outdoors: 100 ft limit because of the airport Source ↗ | 20 ft max for island fixtures and identification signs; peninsulas reach 20 ft only at the center of the back wall (2027 rules) Source ↗ | Islands of 400 sq ft or more: fixtures up to 20 ft; hanging signs and truss limited only by ceiling height and fire rules, inside the booth line (2024) Source ↗ |
|---|
| Hanging signs | At least 4 ft clear above the tallest wall, 1,500 lb maximum, LVCC approval of drawings, all rigging ordered from the official general contractor (2026 rules) Source ↗ | Bottom at least 9 ft off the floor, inside the booth; ceiling and truss signs hung by Freeman; Freeman approves signs over 250 lb hung from equipment (2027 specs) Source ↗ | Unlimited height in booths 20 ft deep or more, hung 5 ft from neighbors; all sign assembly and rigging arranged through the Morial Convention Center (2027 rules) Source ↗ | Approved and installed by Fern Expositions from structural steel only: 3,000 lb on major trusses, 1,500 lb on bar joints, 500 lb per point (2025 rules) Source ↗ | Inline: 8 ft max, no hanging signs; anything over 4 ft within 10 ft of a neighbor sits 5 ft back from the aisle; perimeter walls 12 ft (2027) Source ↗ | Anything suspended needs NMA and venue approval at least 60 days before installation and is hung only by the official contractors (2024) Source ↗ |
|---|
| Engines and fuel | Gasoline and diesel engines run outdoors only; an operating machine has no height limit while it stays inside its space; lifting people with equipment is banned (2026 rules) Source ↗ | Batteries disconnected or ignition disabled; fuel at one-quarter tank or 5 gallons, whichever is less; fill openings sealed; 5 ft between vehicles (Clark County Fire, 2026) Source ↗ | Battery cables disconnected; tank taped or locking cap; no more than one-quarter tank or 5 gallons; a fire marshal may be required at move-in (2027 rules) Source ↗ | Battery cables disconnected and taped; locking or taped gas cap; tank under one-fourth full; no fuel stored in any building (2025 rules) Source ↗ | Gasoline vehicles on static display carry no more than 1/8 tank or 10 gallons, diesel 1/4 tank, keys held by the general contractor (Morial policy, 2022) Source ↗ | No internal combustion engines run indoors during the show; 80 dB max at the booth perimeter; noisy equipment runs only in short periodic cycles (2024) Source ↗ |
|---|
| Floor and ground | LVCC asphalt lots: recommended 250 lb per sq ft; heavier pieces trench plated with LVCVA notice; no drilling or anchoring into concrete sections (2026 rules) Source ↗ | Unlimited in the North, Central and South Halls except aisles C4800 to C4900, capped at 175 lb per sq ft (2027 specs) Source ↗ | Package Plan includes operators and plywood planking for self-propelled units; extra covering under treaded machines billed; no floor paint, adhered covering or drilling (2027 rules) Source ↗ | Dust from aggregate or concrete demos contained in your space; grounds left in original condition, restoration billed by KEC; buried poles in Lot K only (2025 rules) Source ↗ | Concrete slab rated 350 lb per sq ft; parts of Halls H to J take 500 lb; heavier units need engineer-certified plans three months out (Morial policy, 2022) Source ↗ | In LVCC halls S3, S4, C3, C3 Concourse and C4, heavy equipment may need a structural engineering review at the exhibitor's cost (2024) Source ↗ |
|---|
| Paperwork and timing | Stakes drilled, never hand driven; no staking into concrete; tents over 400 sq ft need a Clark County permit; truss plans due 90 days out (2026 rules) Source ↗ | Engineered plans to show management and the LVCC two months before move-in; battery smoke detectors, 2A10BC extinguishers, fire watch over 300 sq ft (2027 specs) Source ↗ | Floor plans for 400 sq ft or more due December 1, 2026; EAC and Non-Official Contractor forms due February 12, 2027; EACs handle display, not product (2027 rules) Source ↗ | Outdoor targeted move-in ran September 24 to October 5, indoor halls October 2 to 6, clean floor at 5 p.m. October 6 (2025 rules) Source ↗ | Noise held under 85 dB on complaint; musicians and singers banned; covered areas of 400 sq ft or more need a battery smoke detector (2027) Source ↗ | Intent to use an exhibitor-appointed contractor due to NMA by May 31, 2024, with its insurance certificate by June 28, or the general contractor builds Source ↗ |
|---|
| One more rule that changes the build | Steel tracks above 250,000 lb roll on 1 in steel plate inside and out; lighter units may use 1 in plywood; site plan to LVCVA (2026 rules) Source ↗ | Demos and viewers stay inside the booth, never on an aisle edge; lighting may not wash into aisles; sound stays inside the booth (2027 specs) Source ↗ | Equipment and viewing platforms have no height limit but may not stand taller than the equipment; towers over 15 ft need stamped engineer drawings on site (2027 rules) Source ↗ | Machinery set back 6 in from all aisles; every machine lowered to transport position and inflatables brought down at the end of each day (2025 rules) Source ↗ | Height limits do not apply to equipment the exhibitor makes, shown in its normal operating position and kept inside the space (2027) Source ↗ | Nevada permits for loads over 8 ft 6 in wide, 14 ft tall, 70 ft long or 80,000 lb; book a heavy hauler 90 days ahead (2024) Source ↗ |
|---|