The lit entrance of the Seattle Convention Center Summit building at night, with its illuminated sign over the plaza steps

Exhibitor guide · Seattle, WA · Updated

Seattle Convention Center Exhibitor Guide

Seattle runs one convention center in two buildings a block apart: Arch, built over Interstate 5 in 1988, and Summit, the stacked high-rise that opened in 2023. The building on your booth confirmation decides your truck dock, your hand-carry door and whether your crates ride a freight elevator. Your show kit decides how much of the booth your own staff may build.

  • 3,000+ exhibitors served
  • 10,000+ booths built
  • 2 days to a design brief

Photo: “Seattle Convention Center Summit Entrance at Night” by jjes84, CC BY 2.0. Source

Quick answers

What exhibitors ask about the Seattle Convention Center

Is the Seattle Convention Center union?Yes.

Washington is not a right-to-work state. The center has a labor agreement with nine local unions, and show labor comes through the contractor's union agreements, such as the Carpenters and IATSE Local 15.

Can my own staff set up our booth?Only small ones.

It depends on the kit. PAX West 2025 allowed booths up to 10×20 without power tools or ladders; AAOMS 2026 allowed only what one person can do in 30 minutes without tools.

Can I unload my own vehicle?At hand-carried freight.

In the Arch or Summit garage, within the strictly enforced one-hour limit. No trailers, and check your van's height against each entrance.

What is the ceiling height?25 ft at Arch, 30 ft at Summit.

Arch Hall 4C is lower at 21 ft. Summit's Finneran Ballroom rises to 55 ft. Your show sets its own booth height rules.

Labor & union rules

Seattle Convention Center union rules: what your team can do itself

Washington is not a right-to-work state. The center keeps a labor agreement with nine local unions for its own staff, does not grant any contractor, drayage company or union exclusive rights at the dock, and honors your show's general contractor and its labor agreement. That makes the show kit the rulebook. Below: the GES rules for two recent Seattle shows, PAX West 2025 and AAOMS 2026 at Summit, plus the center's own exhibitor guidelines.

✓Your full-time staff

  • PAX West 2025: set your own exhibit if the booth is no larger than 10×20 and needs no power tools or ladders
  • AAOMS 2026: only tasks one person can finish in under 30 minutes, without tools or ladders
  • One full-time employee may supervise the contractor's carpenters, or the contractor supplies a foreman
  • Hand-carry your own materials through the hand-carry entrance
  • Hire your own I&D company; each worker signs in at the SCC Staff Entrance with photo ID

●Union labor and the center

  • Carpenters (Pacific Northwest Regional Council; Local 131 in the GES synopsis): exhibit install and dismantle, carpet, drape, hanging signs and all material handling at the docks
  • IATSE Local 15 stagehands: AV, lighting, rigging and lift work
  • Edlen Electrical: exclusive for power, air, water, drain and gas
  • Smart City: exclusive for internet, Wi-Fi and phone · Aramark: exclusive food and beverage
  • All rigging by an ETCP-certified rigger; Encore is exclusive for rigging in the ballrooms
  • GES straight time for AAOMS 2026: Monday–Friday, 8:00 a.m. to 4:30 p.m.

!Never allowed

  • Drilling, coring or punching holes; bolting anything to floors or walls
  • Foam, cellophane, duct or packing tape on any surface
  • Mechanical equipment operated by exhibitors (GES kits)
  • Trailers at hand-carried freight
  • Haze or fog machines, candles, propane, helium balloon giveaways
  • Car batteries and power banks bigger than a phone or tablet charger
  • Children under 16 on the floor during move-in and move-out

Background photo: "Washington State Convention & Trade Center (interior)" by gabofr, CC BY 2.0 Source

Floor plan & exhibit halls

Seattle Convention Center floor plan: Arch Halls 4A–4F and Summit

Arch's six halls sit side by side on Level 4, next to the truck docks, and combine into 205,700 sq ft. Summit stacks its exhibit space instead: a 138,000 sq ft hall below the street and a 100,130 sq ft Flex Hall on Level 2. Tap an Arch hall for its size, clearance and booth count.

Schematic. Hall widths are proportional to floor area, not an architectural plan. Official floor plan booklets for Arch and Summit are on seattlecc.com.

Hall 4A

  • 40,000 sq ft · 260′ × 143′
  • 25 ft ceiling
  • 186 10×10 booths

Two 12 ft wide gates open from Hall 4A straight to the South Dock. Combines with 4B into 80,000 sq ft and 382 booths.

138,000sq ft Summit Exhibit Hall on Level EX, below the street · 30 ft ceiling · 702 booths · Halls 1 and 2 plus a swing section
100,130sq ft Summit Flex Hall on Level 2 · carpeted, 30 ft · up to 460 booths · reached from the dock by freight elevator
58,650sq ft Finneran Ballroom at Summit, column-free, 30–55 ft ceiling · up to 300 booths
44,628sq ft in four Arch ballrooms on Level 6, 21 ft ceilings · the 29,580 sq ft 6E and 15,048 sq ft 6ABC
132meeting rooms: 70 at Arch (including Arch at 800 Pike) and 62 at Summit, plus Summit's 14,000 sq ft Garden Terrace
The arched glass atrium roof over the Arch building's Pike Street entrance, still signed Washington State Convention Center, with crowds below
Arch, when it was still the Washington State Convention Center. “Washington State Convention Center” by Gage Skidmore, CC BY-SA 2.0. Source
Only at the Seattle Convention Center

Seattle Convention Center Arch vs Summit: which building is my booth in?

Since 2023 the center has been two buildings, about a block apart, with separate truck docks, hand-carry doors and elevators. Arch keeps its exhibit halls on one level beside the docks. Summit stacks them, so some booths arrive by freight elevator. Find your building on the show floor plan first, then plan from this table.

For exhibitorsArch (705 Pike)Summit (900 Pine)
Exhibit floorHalls 4A–4F, Level 4 · 205,700 sq ft · 957 boothsExhibit Hall, Level EX · 138,000 sq ft · 702 booths; Flex Hall, Level 2 · 100,130 sq ft
Ceiling25 ft (4C: 21 ft)30 ft in both halls
Floor load250 lbs per sq ft350 lbs per sq ft Exhibit Hall · 250 Flex Hall
Truck dockTwo-lane ramp from Hubbell Place (1315 Hubbell Pl) to Level 4 · South and North docks1715 Boren Ave, between Stewart St and Olive Way · approach southbound
Dock to floorGates straight from the docks into Halls 4A and 4FGates up to 24 × 24 ft into the Exhibit Hall; Flex Hall by a 20,000 lb freight elevator with a 10 ft door
Hand-carry entranceNorth: via 9th Ave, 9′8″ clearance, Halls 4ABC · South: 8th Ave garage, 6′5″, Halls 4DEFSummit garage on Olive, 8′4″, serves every level
Largest ballroom6E · 29,580 sq ft, 21 ftFinneran · 58,650 sq ft, up to 55 ft

Sources: SCC Arch and Summit floor plan booklets (January 2024, April 2026), SCC Docks + Freight page, SCC Exhibitor Guidelines and Event Planning Guide (“SCC: By the Numbers”). The docks page itemizes 9 bays at each Arch dock while SCC's campus page counts 19; confirm with your show's contractor.

Loading dock & move-in

Seattle Convention Center loading dock and freight

Get directions to Seattle Convention Center →

  • Arch docksAn enclosed two-lane ramp on Hubbell Place, between Seneca and Pike, climbs to the Level 4 docks beside the halls. The South Dock has 9 bays (7 take 65 ft trailers) and 16 × 25 ft clearance; the North Dock has 9 bays with 16 ft clearance.
  • Summit dock18 covered bays at 1715 Boren Avenue, mid-block between Stewart Street and Olive Way. SCC asks drivers to approach southbound on Boren and turn right; do not turn left from northbound Boren.
  • MarshalingThere is no on-site truck staging. Under the city's Transportation Management Plan, shows may need an off-site marshaling yard, typically at 80,000 sq ft of exhibits or more; SCC rents one at 9645 Martin Luther King Way South.
  • Hand-carried freightPersonal vehicles unload in the Arch and Summit garages at scheduled times, with a strictly enforced one-hour limit and no trailers. SCC lends a limited number of flatbed carts, first come, first served.
  • No storageNothing may be delivered before the show's official move-in or left after move-out, and SCC has no on-site storage.
  1. Day −90Booth with a roof or covered area of 100 sq ft or more? Submit the plan now; SCC asks for at least three months.
  2. Day −60Rigging plans in, for installation by an ETCP-certified rigger. Design checked against your hall's ceiling.
  3. Day −35EAC and I&D crew names to show management. Edlen power and Smart City internet ordered before the advance-price date.
  4. Day −21Purple ships to Seattle through our carrier network.
  5. Day 0Trucks to the Hubbell Place ramp or the Boren Avenue dock, or via the marshaling yard. Local cars to hand-carried freight.
  6. Show +1Move-out. Everything off the floor by the kit's deadline; nothing stays behind.

Free tool

Seattle Convention Center drayage cost estimator

Planning numbers for 2026 at about $165 per hundredweight, a big-city union rate for the West Coast. SCC publishes no drayage rate; your general contractor's show kit carries the actual tariff. See all venues on the drayage rates page.

Packaging
Routing
Estimated drayage $2,475

Cut this with a lighter booth

Photos: "PAX West 2018" by Sergey Galyonkin, CC BY-SA 2.0 Source · "PAX West 2018" by Sergey Galyonkin, CC BY-SA 2.0 Source · "Washington State Convention Center" by ewen and donabel, CC BY 2.0 Source

A crowd of gamers lounging on beanbags in front of a giant outdoor screen at PAX West 2018 in downtown Seattle

On the plaza at PAX West

Seattle's gaming crowd overflows the halls and takes the beanbags outside.

Photo: "PAX West 2018" by Sergey Galyonkin, CC BY-SA 2.0 Source

The calendar

Seattle Convention Center trade shows 2026–2027

Winter brings software and garden shows, spring the fan conventions, and medical congresses fill the early summer. Confirm dates, building and contractor with each organizer.

Dates are for 2027 editions, from each organizer. Two big fan events also return every year but had no organizer-confirmed 2027 dates when we checked: Sakura-Con (traditionally Easter weekend; April 3–5 in 2026) and PAX West (Labor Day weekend; press reports say September 3–6, 2027). Visitor figure for the Flower & Garden Festival from Wikipedia.

Insider tips

Seattle Convention Center exhibitor tips: what experienced teams do

Put the building on the bill of lading

Arch trucks climb the Hubbell Place ramp; Summit trucks use 1715 Boren Avenue, approached southbound with a right turn in. A driver sent to the wrong dock loses the slot, so name the building and hall on every shipment.

Measure the van before you drive

Hand-carry clearances differ: 9′8″ at Arch North, 8′4″ at Summit, and just 6′5″ at Arch South, which full-size vans will not clear. No trailers anywhere, and the one-hour limit is strictly enforced.

Read the self-setup line in your kit

Two GES Seattle kits drew it differently: up to 10×20 without power tools or ladders at PAX West 2025, but only 30-minute, one-person, tool-free work at AAOMS 2026. Size your crew to the kit, not to the last show.

Flex Hall booths ride an elevator

Summit's Exhibit Hall takes freight through dock gates up to 24 ft high, but the Flex Hall on Level 2 is fed by a 20,000 lb freight elevator with a 10 ft door. Keep crates and pre-built pieces under that height.

Use Summit's floor grid

The Summit Exhibit Hall floor is scored in a 10×10 ft grid that lines up with floor boxes on 30 ft centers, and it carries 350 lbs per sq ft. Mark Edlen power drops against that grid when you order.

Leave the duct tape at home

SCC bans foam, cellophane, duct and packing tape on every surface, and nothing may be drilled or bolted. Choose freestanding structures and carpet methods that need neither.

Where to stay & getting there

Hotels near the Seattle Convention Center

Near Summit

Hyatt Regency Seattle

1,260 rooms at 808 Howell Street, the largest hotel in the Pacific Northwest. Opened in December 2018.

~0.1 mi

Sheraton Grand Seattle

1,236 rooms, among the largest hotels in Seattle, about a tenth of a mile from the center.

~0.1 mi from Arch

Grand Hyatt Seattle

The closest hotel to Arch, steps from its Pine Street entrance.

~40 min by rail

SEA airport by Link

Sound Transit's 1 Line runs from SEA to Westlake Station downtown every 8 to 15 minutes.

On site

SCC garages

The Arch Garage holds about 1,490 vehicles; the Summit Garage a few hundred more. Freeway Park Garage is next door.

The building

From a lid over I-5 to a high-rise convention center

Seattle had no flat land downtown to spare, so it built its convention center over a freeway, and then built the second one up.

Interstate 5 traffic disappearing into a tunnel under the convention center, whose concrete wall carries the Washington State Convention Center logo, with downtown towers behind
Arch spans Interstate 5. “Washington State Convention Center lid” by SounderBruce, CC BY-SA 2.0. Source
Aerial view of the Arch building's broad roof and green glass facades, with the freeway running alongside and trees of Freeway Park below
Arch from above. “Washington State Convention Center” by SounderBruce, CC BY-SA 2.0. Source
A wide wooden staircase descending inside Summit beside floor-to-ceiling windows that look onto downtown streets
Summit's grand staircase. “Seattle Convention Center Summit Grand Staircase with City View” by jjes84, CC BY 2.0. Source
Board-formed concrete terraces and steps in Freeway Park, with autumn leaves and an apartment tower behind
Freeway Park, which the convention center was designed to connect with. “Level with Freeway Park Seattle Washington” by amanderson2, CC BY 2.0. Source
  1. 1988The convention center opens June 18, built in the air space over Interstate 5 on 30 concrete columns and joined to Freeway Park. Cost: $186 million.
  2. 2001A $205 million expansion opens July 14, with a hotel and office tower and a skybridge over Pike Street.
  3. 2010A public facilities district takes over operation from direct state management.
  4. 2018Convention Place transit station closes for good on July 21. Ground breaks for the new building on August 14; it is named Summit, and the original becomes Arch.
  5. 2021Summit tops out in June.
  6. 2022The Washington State Convention Center is renamed the Seattle Convention Center.
  7. 2023Summit hosts its first event January 13, at a final cost of nearly $2 billion, and earns LEED Platinum in December.
  8. 2025Arch and Summit together serve more than 475,000 attendees.

FAQ

Seattle Convention Center FAQ for exhibitors

What is the difference between Arch and Summit?

They are the two buildings of the Seattle Convention Center, about a block apart. Arch (705 Pike Street, opened 1988) has 205,700 sq ft of exhibit halls on one level. Summit (900 Pine Street, opened 2023) has 248,590 sq ft of exhibit space split between a hall below the street and a Flex Hall on Level 2. Each has its own truck dock and hand-carry entrance.

Is the Seattle Convention Center union?

Yes. Washington is not a right-to-work state, the center has a labor agreement with nine local unions, and show labor runs through the general contractor's union agreements. GES's Seattle synopsis names the Carpenters for exhibit work and material handling and IATSE Local 15 for AV, rigging and lifts.

Can I set up my own booth at the Seattle Convention Center?

Only within your show kit's limit. GES allowed full-time employees to set booths up to 10×20 without power tools or ladders at PAX West 2025, but only tasks one person can do in 30 minutes without tools at AAOMS 2026. Bigger builds need the contractor's carpenters or your own EAC.

Can I unload my own vehicle?

Yes, at hand-carried freight in the Arch or Summit garage when show management schedules it. The one-hour limit is strictly enforced, trailers are not allowed, and clearances are 9′8″ (Arch North), 6′5″ (Arch South) and 8′4″ (Summit). Parking is free only if you exit within the hour.

Where is the Seattle Convention Center loading dock?

Arch's docks are on Level 4, reached by an enclosed two-lane ramp on Hubbell Place between Seneca and Pike. Summit's 18-bay dock is at 1715 Boren Avenue between Stewart Street and Olive Way. Larger shows may stage trucks at an off-site marshaling yard.

How much is drayage at the Seattle Convention Center?

Plan about $165 per hundredweight for crated freight. The center does not publish rates; your general contractor's show kit carries the actual tariff.

What is the ceiling height in the exhibit halls?

25 ft in Arch Halls 4A, 4B, 4D, 4E and 4F, 21 ft in Hall 4C, and 30 ft in Summit's Exhibit Hall and Flex Hall. Your show may set lower booth height limits, so confirm your booth location with show management.

Who supplies power and internet?

Edlen Electrical is exclusive for power, air, water, drain and gas, and Smart City for internet, Wi-Fi and phone. Order through SCC's online portal before the advance date for advance pricing.

Can we hand out food samples?

Only if your company makes, processes or distributes food, with show management approval. Samples must be bite size, drinks no more than three ounces, staff need a valid Washington State Food Handler Permit, and you must order porter service.

How do I get from the airport?

Take Sound Transit's 1 Line light rail from SEA to Westlake Station downtown, about 40 minutes, with trains every 8 to 15 minutes.

Exhibiting in Seattle?

Tell us Arch or Summit, and your booth number.

Send your show, building and hall, and what your kit allows your own staff to build. Within two business days you get a design brief sized to that rule, a drayage estimate at Seattle rates and a move-in plan for the right dock, elevator or hand-carry door.

Background photo: "Downtown Seattle" by tdlucas5000, CC BY-SA 2.0 Source

Compare venues

Seattle Convention Center vs other major U.S. convention centers

How the Seattle Convention Center stacks up against other big-city halls we have guides for. Drayage figures are Purple planning rates, not published tariffs.

VenueTypeLargest spaceCeilingLaborDrayage (plan)Airport
Seattle Convention CenterThis guideConvention center205,700 sq ft Arch Halls 4A–4F25 ft Arch · 30 ft SummitUnion · check kit≈ $165/cwtSEA · Link ~40 min
America's Center Convention ComplexSt. LouisConvention center574,000 sq ft contiguous, with Dome floor40 ftUnion · 300 sq ft rule≈ $150/cwtSTL · 14 mi
Anaheim Convention CenterAnaheimConvention center221,284 sq ft Hall D25 ft Hall D · 13 ft 8 in Hall EUnion · check kit≈ $172/cwtSNA · 13 mi
Boston Convention & Exhibition CenterBostonConvention center516,000 sq ft contiguous (Halls A–C)35 ft low · up to 100 ftUnion · staff setup OK≈ $324/cwtBOS · 3 mi
Calvin L. Rampton Salt Palace Convention CenterSalt Lake CityConvention center515,000 sq ft contiguous, 10 halls30 ftRight-to-work≈ $120/cwtSLC · ~6 mi
Charlotte Convention CenterCharlotteConvention center280,000 sq ft contiguous, Halls A–C30 ft listed maxRight-to-work≈ $115/cwtCLT · 7 mi
Fontainebleau Las VegasLas VegasResort ballrooms105,264 sq ft Royal Ballroom28 ft 10 inUnion · check kit≈ $185/cwtLAS · 4.3 mi
Georgia World Congress CenterAtlantaConvention center1M+ sq ft contiguous (Halls B, BC, C)30 ft to gridRight-to-work≈ $150/cwtATL · 15–20 min
Huntington PlaceDetroitConvention center623,000 sq ft contiguous, Halls A–D30 ft (A–D) · 18 ft 8 in (E)Union · 400 sq ft rule≈ $155/cwtDTW · 20 mi
Iowa Events CenterDes MoinesConvention center150,000 sq ft contiguous, EMC Expo Center Halls A–C35 ft (Halls B–C)Right-to-work≈ $100/cwtDSM · ~10 min
Javits CenterNew YorkConvention center~500,000 sq ft contiguous (Level 3)Varies by hall · check planUnion · 250 sq ft rule≈ $195/cwtEWR / LGA / JFK · 45–70 min
Kansas City Convention CenterKansas CityConvention center388,800 sq ft column-free, Bartle Hall A–E33 ft A–C · 42 ft D–EIATSE 31 · check kit≈ $145/cwtMCI · ~19 mi
McCormick PlaceChicagoConvention center840,000 sq ft Hall A (South) · 1.2M+ on one levelVaries by hall · check planUnion · staff setup any size≈ $210/cwtMDW · ~20 min
Minneapolis Convention CenterMinneapolisConvention center376,200 sq ft contiguous, Halls B–E30 ft 6 in to truss · 85 ft domesUnion · open dock≈ $150/cwtMSP · ~20 min
Moscone CenterSan FranciscoConvention center502,440 sq ft contiguous, Halls A–F37 ft Halls A–C · 28 ft Hall FUnion · check kit≈ $180/cwtSFO · 25–40 min
Oklahoma City Convention CenterOklahoma CityConvention center200,730 sq ft continuous, up to 4 halls30 ftRight-to-work≈ $105/cwtOKC · ~9–10 mi
Orange County Convention CenterOrlandoConvention center1,103,538 sq ft West Building30–40 ftRight-to-work≈ $155/cwtMCO · 12 mi
Oregon Convention CenterPortlandConvention center255,000 sq ft Halls A–E30 ftUnion · check kit≈ $150/cwtPDX · MAX ~30 min
San Diego Convention CenterSan DiegoConvention center525,701 sq ft contiguous, Halls A–H27 ft 4 in A–E · up to 64 ft F–HUnion · check kit≈ $176/cwtSAN · 3 mi
San Jose McEnery Convention CenterSan JoseConvention center143,000 sq ft Halls 1–332 ftUnion · 30 min / 10 ft rule≈ $160/cwtSJC · 4 mi
Santa Clara Convention CenterSanta ClaraConvention center90,014 sq ft Halls A–D28 ft 6 inUnion · check kit≈ $160/cwtSJC · 5–6 mi

More big-city guides

Other major U.S. convention centers

All venue guides →

Written by the Purple Exhibits team. Reviewed for the 2026–2027 season. Figures marked for verification are being confirmed with the venue. Sources: Seattle Convention Center floor plan booklets for Arch (January 2024) and Summit (April 2026), SCC Docks + Freight and campus pages, SCC Exhibitor Guidelines (2024) and Event Planning Guide (2025), GES show site work rules and Seattle union contract synopsis (PAX West 2025, AAOMS 2026), Wikipedia (Seattle Convention Center, Hyatt Regency Seattle, Sheraton Grand Seattle, PAX), Visit Seattle, TSNN, Sound Transit via SCC, and organizer sites for Acumatica Summit, the Northwest Flower & Garden Festival, Emerald City Comic Con and the American Transplant Congress.

All Washington venue guides →