Woman with red lips resting above glowing light strands, a fiber broadband mood for Fiber Connect Nashville

telecom and wireless · Nashville

Fiber Connect 2027Booth costs, dates and deadlines: the Nashville exhibitor guide

Splices, enclosures and an AI pavilion: Fiber Connect 2027 booths in Nashville

Event dates
June 13–16, 2027
Exhibit hall
June 14–15, 2027 (Expo Hall and AI & Quantum Pavilion 11:30 a.m.–6 p.m. both days)
Venue
Gaylord Opryland Resort & Convention Center, Nashville

4.9 star rating from clients10,000+ booths builtSince 20153,000+ exhibitors served

LeadSquared booth by Purple Exhibits: leadSquared island booth on the show floor, one of our builds to compare for Fiber Connect
Built by PurpleLeadSquared island
data-pixel booth by Purple Exhibits: inline booth with dark navy fabric back wall printed with fiber inspection imagery, the kind of booth we build for Fiber Connect
Built by Purpledata-pixel inline booth
  • 5,028attendees at Fiber Connect 2026 source
  • 1,200+companies represented in 2026 source
  • 300+exhibitors expected in 2027, per FBA source
  • 1in 3paid attendees from network operators, 2026 source

Quick answers

Fiber Connect 2027 in 30 seconds

The short version for Fiber Connect exhibitors. Every figure here has its source further down the Fiber Connect page.

When is Fiber Connect 2027?
June 13–16, 2027, at Gaylord Opryland Resort & Convention Center, Nashville.
When is the hall open at Fiber Connect?
June 14–15, 2027, Expo Hall and AI & Quantum Pavilion 11:30 a.m.–6 p.m. both days.
How big is Fiber Connect?
5,028 attendees (2026 edition).
What does Fiber Connect booth space cost?
Blue $5,150 member / $6,595 non-member; Green $5,925 / $6,975, per booth, 2027, paid to the organizer.
How much is a 10×20 booth at Fiber Connect, all-in?
$7,500 – $15,000 for a Purple rental in Nashville: design, graphics, lighting, install and dismantle. Fiber Connect bills space and show services separately.
For Fiber Connect, what is the next exhibitor deadline?
Fiber Connect 2027 registration opens; hotel link follows registration: November 9, 2026.

The lookNashville 2027

Glass that glows. Nashville, wired.

Fiber Connect 2027 runs June 13–16 at Gaylord Opryland, Expo Hall June 14–15. Operators, utilities, engineers and installers come for 300+ exhibitors, per FBA; 5,028 attended in 2026, about one in three paid attendees from a network operator.

Smiling woman in a lilac sweater lit by points of light, the fiber glow of Fiber Connect 2027
01Points of light
Woman lit by violet and blue light like optical fiber, a Fiber Connect 2027 mood in Nashville
02Violet in the glass
Green light trail across a woman's face in the dark, a fiber optic light look for Fiber Connect
03A single green line
Line worker in a bucket lift working at a utility pole, an aerial fiber build look for Fiber Connect
04Up on the pole
Woman in a white knit top holding glowing light tubes, a light-in-glass mood for Fiber Connect Nashville
05Holding the light
Woman lit by a spray of glowing orange optical fibers in the dark, a fiber broadband mood for Fiber Connect 2027
06Glass on fire
Man with green data characters projected across his face, a fiber network mood for Fiber Connect Nashville
07Data, face on
Woman in black holding a bright point of light in a dark forest, a light-in-glass look for Fiber Connect 2027
08Carry the light
Man holding glowing cyan light tubes in a neon-lit room, a fiber optic glow for Fiber Connect in Nashville
09Cyan in hand

Everything about Fiber Connect 2027 in one place

Fiber Connect 2027 fact sheet

Fiber Connect 2027 key facts
Official nameFiber Connect 2027 by the Fiber Broadband Association
Event datesJune 13–16, 2027
Exhibit hall datesJune 14–15, 2027 (Expo Hall and AI & Quantum Pavilion 11:30 a.m.–6 p.m. both days) source
VenueGaylord Opryland Resort & Convention Center
2800 Opryland Dr, Nashville, TN 37214
OrganizerFiber Broadband Association (FBA)
Size (2026)5,028 attendees source
Who attendsFiber broadband providers, municipal and utility broadband teams, engineers, installers and investors
Booth spaceBlue $5,150 member / $6,595 non-member; Green $5,925 / $6,975, per booth, 2027 source
Next deadlineFiber Connect 2027 registration opens; hotel link follows registration: November 9, 2026 source
Nearest airportNashville International Airport (BNA)
HotelsGaylord Opryland group block at $279 including resort fee, booked through the registration confirmation link
Official hotel page →
Official websitefiberconnect.fiberbroadband.org

Official Fiber Connect resources

Fiber Connect 2027 calendar

Fiber Connect 2027 dates and deadlines

The dates the organizer has published, in order, each linked to the page that states it. We highlight the next one.

  1. Fiber Connect 2027 registration opens; hotel link follows registrationAll source
  2. Call for speakers closes, 8 p.m. ETSpeakers source
  3. Gaylord Opryland group rate cutoffAll source
  4. Pre-conference workshops and Welcome ReceptionAll source
  5. Expo Hall and AI & Quantum Pavilion open, 11:30 a.m.–6 p.m.All source
  6. AI & Quantum Infrastructure SummitAll source

01 Purple at Fiber Connect 2027

Splices, enclosures and an AI pavilion: Fiber Connect 2027 booths in Nashville

Fiber Connect is where broadband operators, municipal and utility teams and installers shop for the whole fiber build, so we design booths that let a technician handle the closure and an operator sit down about the network. The Expo Hall is uncarpeted, so flooring goes into every quote.

  • Expo June 14–15 · Opryland
  • 5,028 attendees in 2026
  • New AI & Quantum Pavilion

What makes Fiber Connect different, and how we build for it

Fiber Connect is the Fiber Broadband Association's annual conference and expo, built around the whole fiber-to-the-home business: deployment, outside plant, financing, policy and now AI infrastructure.The Expo floor holds the OpTIC Path Rodeo, a live installation and splicing contest, the Expo Hall Theater, a Proof of Concept floor and, new for 2027, the AI & Quantum Infrastructure Pavilion. The Broadband Investment Forum, the C Suite Forum and the Awards Gala draw executives, and Steve Wozniak gives the Wednesday keynote at the AI & Quantum Infrastructure Summit. Visitors range from splicers to CFOs, so a booth needs a workbench and a meeting table.

Fiber broadband operators

A clear system view from OLT to ONT, proof from builds their size, and a table to talk pricing, supply and support for the next phase of the network.

Municipal, utility and cooperative broadband teams

Plain answers on cost per passing, construction methods and funding programs, with case studies from towns and utilities like theirs.

Engineers, technicians and installers

Closures, connectors, splicers and test gear they can handle and try, ideally right after watching the OpTIC Path Rodeo.

Your team in Nashville

Two shops and one project manager for Fiber Connect

Production happens in our own shop in Fishkill, NY, and at our Las Vegas hub, and we ship to the Gaylord Opryland Resort & Convention Center and install with vetted local labor, led by our own project manager on the floor. A predictable 30–45-day turnaround, secure storage and a pre-show QA before Fiber Connect.

When your team gets to Nashville, the booth is lit and stocked. You just show up.

New at Fiber Connect 2027

  1. AI & Quantum Infrastructure Pavilion

    A new pavilion on the 2027 Expo floor sells 10×10 standard, 10×10 turnkey and 20×20 space to AI, data-center and quantum infrastructure firms. Data-center connectivity companies now have their own neighborhood at a fiber show. source

  2. Wednesday summit with Steve Wozniak

    June 16 becomes the AI & Quantum Infrastructure Summit, with a Steve Wozniak keynote, three panels and the CEO Breakfast, and a summit-only pass. The Expo closes Tuesday, so plan executive meetings for Wednesday off the floor. source

  3. Moves to Nashville in June

    After Gaylord Palms in Orlando in May 2026, Fiber Connect 2027 moves to Gaylord Opryland in Nashville, June 13–16. The later date gives an extra month for builds after spring shows like BICSI Winter and RTIME. source

Inside Fiber Connect 2027

5,028 attendees at Fiber Connect 2026 source1,200+ companies represented in 2026 source300+ exhibitors expected in 2027, per FBA source1 in 3 paid attendees from network operators, 2026 source

Fiber Connect rules that shape your booth

Flooring is the exhibitor's job

FBA's 2027 package excludes carpet or protective flooring and requires exhibitors to order it, along with hardline internet, electrical, catering and AV. We ship a booth floor that also carries the bench power and data runs.

Organizer rule

Section pricing sets your location

Fiber Connect 2027 sells booths by section, Gold Section Premium, Green or Blue, with $300 for each corner, and members pay less in every section. We lay out the booth for the corners you buy so open sides face traffic.

Organizer rule

Hotel through registration only

Gaylord Opryland rooms at the $279 FBA rate can be booked only with the link in your registration confirmation, after registration opens November 9, 2026, with a May 20, 2027 cutoff. We book crew rooms the same way.

Organizer rule

Topics set by FBA for speakers

FBA's 2027 call for speakers asks applicants not to send session ideas or abstracts, because the association sets the topics; proposals close November 30, 2026. Tie your booth story to the track you apply for.

Organizer rule

Programs worth planning for

AI & Quantum Infrastructure Summit

Wednesday, June 16, 2027: an opening keynote by Steve Wozniak, three panels and the CEO Breakfast, sold as a summit-only pass or with the full conference.

Official details

OpTIC Path Rodeo

A live, hands-on installation and splicing competition on the Expo floor for new and experienced technicians; the call for contestants opened October 1, 2026.

Official details

Broadband Investment Forum and C Suite Forum

Part of the Executive Experience, with the Executive Experience Lounge, for operators, investors and senior leaders during the June 14–15 conference days.

Official details

Expo Hall Theater

Short sessions on the Expo floor, alongside the Proof of Concept floor, that bring attendees into the hall during the June 14–15 expo hours.

Official details

Fiber Connect is North America's fiber-to-the-home show; choose it over BICSI Winter when you sell outside-plant fiber, access equipment or software to broadband operators, utilities and municipalities rather than inside-building cabling to designers. Compare all the telecom and wireless shows we build for →

02 Booths & pricing for Fiber Connect 2027

Popular booth sizes at Fiber Connect

FBA prices Fiber Connect booths per 10×10 by section: Gold Section Premium, Green and Blue, with $300 per corner, and sells 10×10 and 20×20 space in the AI & Quantum Infrastructure Pavilion. A 10×20 carries one product family and a splicing bench; step up to a 20×20 island when outside-plant hardware and operator meetings share the space.

Easy Shopper booth by Purple Exhibits: lime-green Easy Shopper backlit wall with stats graphics, the kind of booth we build for Fiber Connect
Inline10×20$7,500 – $15,000all-in rental

A lit wall of cable, connectors and closures, a splicing or test bench a technician can use and a flooring deck, since the hall is not carpeted.

Pictured: Easy Shopper, a Purple inline booth

See 10×20 rental booths →
Lunawood booth by Purple Exhibits: clean white Lunawood ThermoWood booth with a large white hanging sign, shown for Fiber Connect exhibitors
Inline10×30$12,000 – $22,000all-in rental

Three bays for the network story: central office gear, outside plant hardware and the home, with a software screen in the middle bay.

Above: Lunawood, a Purple inline booth

See 10×30 rental booths →
Amazon Prime Video booth by Purple Exhibits: bright blue Prime Video Culture Rated wall with a large screen, one of our builds to compare for Fiber Connect
Island20×20$16,000 – $40,000all-in rental

An island with an outside-plant display on one side, an OLT and ONT demo on another, a meeting table for operators and a hanging sign if FBA's manual allows.

Pictured: Amazon Prime Video, a Purple large-format exhibit

See 20×20 rental booths →
Prime Video booth by Purple Exhibits: open Prime Video experiential space with a pink-to-blue gradient back wall, a reference for planning a Fiber Connect booth
Island20×30+$25,000 – $55,000all-in rental

A full fiber-to-the-home walkthrough from cabinet to living room, a training counter, a private meeting room and a lounge for the Broadband Investment Forum crowd.

Pictured: Prime Video, a Purple island exhibit

See 20×30 rental booths →

In Purple's Fiber Connect price

  • Design and a 3D rendering for Fiber Connect, revised until it is right
  • Structure, printed graphics, counters and storage, as specified for Fiber Connect
  • Lighting and power distribution inside your Fiber Connect booth
  • Installation and dismantle at the Gaylord Opryland Resort & Convention Center, with our project manager on the floor
  • Show-service orders and deadlines for Fiber Connect, tracked on your behalf

Paid to Fiber Connect and its contractor

  • Exhibit space (paid to Fiber Broadband Association)
  • Drayage, or material handling, when it is not in the Fiber Connect space rate
  • Electrical service, internet and rigging at the Gaylord Opryland Resort & Convention Center
  • Booth cleaning and any union labor the Gaylord Opryland Resort & Convention Center requires

Rates to plan with for Fiber Connect:

  • Booth space Blue $5,150 member / $6,595 non-member; Green $5,925 / $6,975, per booth, 2027 source
  • Premium section Gold Section Premium $8,000 member / $8,500 non-member; corners $300 each, 2027 source
  • AI & Quantum Pavilion 10×10 turnkey $10,500 / $12,500; 20×20 $20,600 / $26,380, 2027 source
  • Hotel $279 a night including resort fee at Gaylord Opryland, cutoff May 20, 2027 source

Your proposal estimates all of these, so the total for Fiber Connect is on paper before you sign anything.

The prices above are all-in 2026 rental ranges covering design, structure, graphics, installation and dismantle; custom builds for Fiber Connect are quoted per project. Get an exact number for Fiber Connect with the booth cost calculator or the 2026 booth cost guide.

All fees listed upfront, in full, on paper, before Fiber Connect.
Tell us your Fiber Connect booth size and what the space has to do. A reply within one business day, then a Fiber Connect rendering and fixed proposal, usually within a week. No charge.
Get my Fiber Connect proposal
Barantech booth by Purple Exhibits: white inline booth for Barantech with blue LED edge lighting, a Purple build like the booths we plan for Fiber Connect

Your team walks into a lit, stocked booth. You just show up.

Barantech inline booth: designed, built and installed by Purple Exhibits

03 Built by Purple

Booths to look at before you plan Fiber Connect

KLEEMANN booth by Purple Exhibits, one of our case studies for Fiber Connect planning

Case study · KLEEMANN

KLEEMANN at an industrial technology exhibition

Digital simulations, real product showcases and a floor plan that guided visitors from first step to last, in an interactive booth for a global elevator manufacturer.

KLEEMANN's exhibit combined hands-on product with a guided path through the system; a Fiber Connect booth does the same from central office to curb to home, with a bench a technician can actually use.

Read the KLEEMANN case study All case studies →

“If you’re looking for a trade show booth expert who shows up and gets the job done right, Purple Exhibits is the real deal.”

Magdalena Kulisz, Service Manager, Miss Immigrant USA · read more client reviews
Since 201510,000+ booths built3,000+ exhibitors served4.9★ client rating

Trusted by exhibitors including

BlueforsScarlet TechNetronixChara TechnologiesMonitor CorporationPEL

04 Designing for fiber cable, connectivity, splicing and test, OLT and ONT equipment, software and construction companies at Fiber Connect

Four things we get right for Fiber Connect exhibitors

Downtown Nashville skyline lit at night, reflected in the Cumberland River1

Let the technician try it

Fiber Connect draws installers who judge a closure or connector by working it. We build a bench at counter height with task lighting, waste trays for fiber scraps and locking storage for splicers and test sets, and we plan it next to the aisle so a demo pulls a crowd from the OpTIC Path Rodeo.

Straight two-lane country road with a utility pole under a pink and purple sunset2

Floor the bare hall

FBA's 2027 exhibitor page says carpet or protective flooring is not included and must be ordered. We ship a booth floor with the build, which also hides cable runs to the bench and screens, and keeps heavy reels and cabinets level.

3

Tell the network story in one line

Operators, utilities and investors walk the same aisle. We lay the booth out as a path from central office to curb to home, so each visitor finds their part of the build, and the sales team can start the conversation by pointing at the wall.

4

A demo for the AI & Quantum Pavilion

The new AI & Quantum Infrastructure Pavilion sells 10×10 turnkey and 20×20 space for data-center and AI connectivity companies. We design compact, high-density demos with high-fiber-count cable and lit rack displays that fit a 10×10 and scale up to a 20×20.

3D booth concept by Purple Exhibits for sensei, like the renderings in a Fiber Connect proposal

Concept rendering

A rendering like this comes with every proposal

You see your Fiber Connect booth in 3D before we cut a single panel: layout, graphics, lighting and product positions, revised until it is right. This one is a Purple concept for sensei.

Start my Fiber Connect concept

Floor at a glance

Where you could be at Fiber Connect 2027

Fiber Connect 2027 puts its Expo Hall, pavilion and stages at Gaylord Opryland. FBA prices the floor by section, and each area pulls a different visitor.

AExpo Hall sections
BAI & Quantum Infrastructure Pavilion
COpTIC Path Rodeo and Expo Hall Theater
Gaylord Opryland Resort & Convention Center, NashvilleSchematic, not to scale
A

Expo Hall sections

Gold Section Premium, Green and Blue sections priced per booth, open June 14–15 from 11:30 a.m. to 6 p.m.; flooring is not included.

Our advice Gold sits at a premium for traffic; a corner adds $300 and doubles your open sides for a bench demo.

B

AI & Quantum Infrastructure Pavilion

New for 2027: 10×10 standard, 10×10 turnkey and 20×20 space for AI, data-center and quantum infrastructure companies, with quantum demonstrations in the program.

Our advice A turnkey 10×10 here needs only graphics and a demo; we supply both, ready to drop into FBA's structure.

C

OpTIC Path Rodeo and Expo Hall Theater

The live installation and splicing contest and the theater both sit on the Expo floor next to the Proof of Concept floor.

Our advice Booths near the Rodeo catch technicians right after a heat; schedule your own demo to start as each round ends.

05 Gaylord Opryland Resort & Convention Center · Nashville

Logistics for Fiber Connect 2027, handled

Fiber Connect 2027 runs at Gaylord Opryland Resort & Convention Center in Nashville, with the conference, expo and hotel under one roof. FBA's booth package includes 8-foot black pipe and drape, 3-foot side drape, an ID sign, four exhibitor passes and an app listing; carpet, hardline internet, electrical, catering and AV are ordered through the 2027 Exhibitor Services Manual. The Expo Hall opens at 11:30 a.m. on Monday and Tuesday, June 14–15. We order the services from the manual, ship to its warehouse address and set the booth on our own floor under our project manager.

What Purple handles

  • Splicing and test benches with task lighting and storage
  • Booth flooring for the uncarpeted Expo Hall
  • Exhibitor Services Manual orders for power, internet and AV
  • Compact AI & Quantum Pavilion demos that scale from 10×10
  • Freight, install and dismantle at Gaylord Opryland
Glass-roofed Delta Atrium of Gaylord Opryland Resort with tropical plants and a riverboat landing
The Delta Atrium at Gaylord Opryland

Your Fiber Connect timeline, from move-in back

Fiber Connect 2027 call for speakers closes, 8 p.m. ET: November 30, 2026. A speaking slot brings operators to your booth; if you are applying, we plan booth graphics that tie into your session.

Design sign-off for Fiber Connect is due by early April 2027.

  1. November 2026Registration opens November 9; speaker proposals close November 30. Book your booth section with FBA sales.
  2. Early April 2027Design sign-off, about ten weeks before move-in: bench demo, product walls, flooring and meeting area.
  3. April to May 2027Production over 30 to 45 days in Fishkill, NY; demo cable and closures fitted in the shop.
  4. May 20, 2027Gaylord Opryland group rate cutoff; Exhibitor Services Manual orders for flooring, power and internet placed.
  5. Days before June 14, 2027Move-in at Gaylord Opryland; our project manager installs, lays the floor and tests every bench and screen.
  6. June 14–16, 2027Expo Hall June 14–15, dismantle after close, booth to storage for your next broadband show.

Planning timeline from Purple. Move-in, freight target and order deadlines are set by the Fiber Connect exhibitor kit and your assigned schedule; we confirm them for your booth once you book.

Print the Fiber Connect budget & deadline sheet

Travel to Fiber Connect 2027

Getting to Fiber Connect 2027: airport and hotels

Fly in

Nashville International Airport (BNA)

Stay

Gaylord Opryland group block at $279 including resort fee, booked through the registration confirmation link

Official Fiber Connect hotels →

Find the venue

Gaylord Opryland Resort & Convention Center
2800 Opryland Dr, Nashville, TN 37214

Open in Google Maps →

Travel facts from fiberconnect.fiberbroadband.org.

Fiber Connect by the numbers

Fiber Connect year by year

2026
5,028 attendees
Orlando (Gaylord Palms, May 17–20) source
AttendeesExhibitors

How Fiber Connect 2027 compares with other telecom and wireless shows

The telecom and wireless shows closest to Fiber Connect on the calendar, with the latest size each organizer has published. Each name other than Fiber Connect opens our exhibitor guide for that show.

ShowDatesCityLatest published size
ISPAMERICAWISPA (Wireless Internet Service Providers Association)March 1–4, 2027Cherokee, NC1,500+ attendees · 100+ exhibitors (2025)
SATELLITEAccess Intelligence (SATELLITE and GovMilSpace)March 8–11, 2027Washington, DC14,738 attendees (2026)
IWCEInforma Connect (IWCE)March 8–11, 2027Las Vegas, NV3,600+ attendees · 225+ with sponsors exhibitors (2026)
ITWtechoraco (Capacity Media events)May 10–13, 2027National Harbor, MD120+ exhibitors, per ITW (2027 site)
Connect (X)Wireless Infrastructure Association (WIA)May 10–12, 2027Phoenix, AZ3,100 registrants attendees · 238+ sponsoring and exhibiting companies (2026)
Dayton HamventionDayton Amateur Radio Association (DARA)May 21–23, 2027Xenia, OH–
Fiber ConnectFiber Broadband Association (FBA)June 13–16, 2027Nashville, TN5,028 attendees (2026)
Broadband Communities SummitBroadband Communities (Total Telecom)July 20–22, 2027Houston, TX–
APCOAPCO International (Association of Public-Safety Communications Officials)July 25–28, 2027Anaheim, CA200+ exhibitors (2026)
SCTE TechExpoSCTESeptember 28–30, 2027Denver, CO290+ exhibitors, sponsors and partners (2025)

Fiber Connect exhibitor questions

Questions exhibitors ask us before Fiber Connect

What are the Fiber Connect 2027 dates?

Fiber Connect 2027 runs June 13–16, 2027 in Nashville. Sunday, June 13 holds pre-conference workshops and the Welcome Reception, the Expo Hall is open Monday and Tuesday, June 14–15, from 11:30 a.m. to 6 p.m., and Wednesday, June 16 is the AI & Quantum Infrastructure Summit.

Where is Fiber Connect 2027 held?

Fiber Connect 2027 is at the Gaylord Opryland Resort & Convention Center in Nashville. Hotel, conference and Expo Hall share one property, and FBA's group rate is $279 a night including the resort fee, with a May 20, 2027 cutoff; the booking link comes with your registration confirmation.

How much does a booth at Fiber Connect 2027 cost?

FBA's 2027 rates per booth are $5,150 member and $6,595 non-member in the Blue Section, $5,925 and $6,975 in Green, and $8,000 and $8,500 for Gold Section Premium, plus $300 per corner. Our 10×20 rental runs $7,500 to $15,000 on top of space; flooring and demo benches move the number.

What is the AI & Quantum Infrastructure Pavilion?

The AI & Quantum Infrastructure Pavilion is new for 2027, on the Expo floor beside the main sections. A 10×10 standard costs $5,150 for members and $6,595 for non-members, a 10×10 turnkey $10,500 or $12,500, and a 20×20 standard $20,600 or $26,380, per FBA.

What is included with a Fiber Connect booth?

Each booth includes 8-foot black pipe and drape, 3-foot side drape, a company ID sign, four exhibitor conference passes and a listing in the app and website. Carpet or protective flooring, hardline internet, electrical, catering and AV are not included and come from the 2027 Exhibitor Services Manual.

How many people attend Fiber Connect?

Fiber Connect 2026 drew 5,028 attendees from more than 1,200 companies, with network operators about one in three paid attendees, per FBA. For 2027 the association expects more than 5,000 fiber and digital infrastructure professionals and 300+ exhibitors.

Who exhibits at Fiber Connect?

Fiber Connect exhibitors make fiber cable, connectivity, splicing and test gear, OLT and ONT equipment, software and construction services. The 2027 site lists Gaiia and Sumitomo Electric as Diamond sponsors and Adtran, Calix, Cisco, Corning, Dycom, Graybar and Nokia at Platinum; the full 2027 exhibitor list is not confirmed yet.

What is the OpTIC Path Rodeo?

The OpTIC Path Rodeo is Fiber Connect's live, hands-on competition testing installation and splicing skills, open to new and experienced technicians. It returns in 2027 on the Expo floor, and FBA opened the call for contestants on October 1, 2026.

Who organizes Fiber Connect?

The Fiber Broadband Association (FBA) organizes Fiber Connect as its annual conference and expo. FBA members get lower booth rates, and sponsorship and exhibit sales run through its sales director, Lucy Green.

What are the Fiber Connect 2027 deadlines?

Registration opens November 9, 2026, with the hotel link following registration, and the call for speakers closes November 30, 2026 at 8 p.m. ET. The Gaylord Opryland group rate has a May 20, 2027 cutoff, and the Expo Hall opens June 14 at 11:30 a.m.

Can we rent a booth for Fiber Connect?

A rental suits Fiber Connect: we supply the frame, product walls, bench and floor, mount your closures and cable, and print graphics for your network story. The same kit can serve BICSI Winter, NTCA RTIME or the Broadband Communities Summit with new graphics.

What hotel is closest to Fiber Connect 2027?

Gaylord Opryland itself: FBA's block puts hotel, sessions and Expo Hall under one roof at $279 a night including the resort fee. Book through the link in your registration confirmation before May 20, 2027, and fly into Nashville International Airport (BNA).

Can Purple build our Fiber Connect booth?

We design around your hardware, build the bench and the floor the hall needs, order services from FBA's 2027 Exhibitor Services Manual and install at Gaylord Opryland with our own project manager. Every cost sits on a fixed proposal.

Is Fiber Connect worth exhibiting at?

Fiber Connect is the fiber show to plan for if you sell fiber, optical connectivity or broadband access gear in North America: about a third of its 2026 paid attendees were network operators, per FBA. Two expo days make pre-booked meetings and a working demo essential.

Before you sign for Fiber Connect

Five things to ask every builder quoting Fiber Connect:

  1. Are all fees on paper, including what the contractor at the Gaylord Opryland Resort & Convention Center bills?
  2. Who actually builds it for Fiber Connect: your shop or a subcontractor?
  3. Will your own project manager be at Fiber Connect for install and dismantle?
  4. For Fiber Connect, what is in the rental and what is billed by the show?
  5. What happens to the booth after Fiber Connect, and what does storage cost?

Common situations

Already own a booth? We refresh the graphics and repair what is worn, then ship it, install it and store it between shows. You keep using the structure you already paid for.

Exhibiting from outside the US? We handle the ground work for Fiber Connect: freight to the advance warehouse, show-service orders, installation and storage, with one project manager replying to your emails in your time zone.

Short on time? A rental with your graphics can be ready for Fiber Connect in two to three weeks. We tell you on the first call what is realistic before Fiber Connect.

Get a proposal

Tell us about your Fiber Connect booth

Add booth details (optional)

We reply to Fiber Connect requests within one business day. The rendering and fixed proposal usually take about a week. No charge, no commitment.

Your Fiber Connect request goes straight to Purple’s exhibit team.

What happens next

  1. You get a reply within one business day, asking about your products, goals and footprint at Fiber Connect.
  2. You get a concept rendering and a fixed proposal, usually within a week. No fee left off: every Fiber Connect cost is listed upfront, on paper.
  3. In 30–45 days we build it, ship it to the advance warehouse and install it before the hall opens.
Photo credits