The Los Angeles skyline at dusk with the Ritz-Carlton Hotel tower

Exhibitor guide · Los Angeles, CA · Updated

Los Angeles Convention Center Exhibitor Guide

Also known as LACC and L.A. Convention Center

The LACC is building its biggest project ever while shows keep running: a $2.62 billion expansion over Pico Boulevard that joins South Hall and West Hall before the 2028 Olympics. Until then you plan around a closed street, a fully union floor and five exhibit halls with ceilings from 17 to 40 ft.

  • 3,000+ exhibitors served
  • 10,000+ booths built
  • 2 days to a design brief

Photo: the downtown Los Angeles skyline at dusk, with the Ritz-Carlton tower at L.A. LIVE. Carol M. Highsmith, Library of Congress, public domain.

  • 720,000sq ft of exhibit halls, before the expansion
  • 1,72010×10 booths in South Hall G to K
  • 40 ftSouth Hall ceiling · booths up to 36 ft
  • 190,000sq ft being added over Pico Boulevard
  • 64meeting rooms across the campus
  • 8 minwalk from Metro's Pico station (A and E Lines)

Quick answers

What exhibitors ask about the Los Angeles Convention Center

The LACC is in the middle of the largest capital project in its history and stays open for shows the whole time. For anyone booking in the next few years, that means confirming which halls and entrances your show uses, planning for a fully union floor with clear trade jurisdictions, and budgeting real time and money for downtown traffic and parking.

Is the LACC union?Yes, fully union.

California has no right-to-work law. Booth installation, drayage, rigging and electrical work belong to union trades through your show's official contractor; Decorators Local 831 has claimed exhibit setup and dismantling at past LACC shows.

Can my own staff set up our booth?Only small, quick jobs.

Past LACC show rules let one person set up without tools in under half an hour. Bigger booths need union installers, and your full-time staff may work alongside them one to one. Check your show kit.

Is the LACC open during the expansion?Yes, fully.

The builders say the center stays fully operational. Pico Boulevard between Figueroa Street and LA Live Way is closed around the clock until March 31, 2028, so check your show's routes.

How tall can my booth be?Up to 36 ft in South Hall.

The center lists 36 ft in South Hall, 33 ft in West Hall (22 ft under the rear soffit) and 16 ft in Kentia Hall. Anything over 12 ft needs a wet-stamped engineering plan.

Nighttime skyline view of Los Angeles looking west toward the setting sun
Los Angeles at night. Photo: Carol M. Highsmith, Library of Congress, public domain.
Only at the Los Angeles Convention Center

LACC Olympic expansion: building for 2028 while the shows go on

The city approved the $2.62 billion expansion and modernization in September 2025 and broke ground on October 1, 2025. New exhibit space above Pico Boulevard will join South Hall and West Hall, with a rooftop ballroom on top. In October 2026 the Mayor's office said the project is on time and on budget.

  • 190,000 sq ftof new exhibit space over Pico, creating one contiguous hall of more than 750,000 sq ft
  • Mar 31, 2028Pico Boulevard stays closed between Figueroa Street and LA Live Way until then; substantial completion is targeted for spring 2028
  • Summer 2028LA28 takes the building from June 1 to the end of August 2028; construction pauses during the Games
  • ~40,000 + 95,000sq ft of new meeting rooms and multipurpose space, including the rooftop ballroom
  • 2029final completion, with spring to May 2029 given as the target

Sources: Populous (groundbreaking, October 2025), Skift Meetings (September 2025), MyNewsLA (October 7, 2026) and the LACC Getting Here page. Ask your event manager which halls, docks and entrances your show uses during construction.

History

Los Angeles Convention Center history: from a tornado to two Olympics

The LACC has weathered a tornado, given up a hall for an arena, outlived a stadium plan, and is now racing to be ready for its second Olympics in 44 years.

The green-glass tower and glass entrance pavilion of the Los Angeles Convention Center behind palm trees on a clear day
The green-glass tower of the James Ingo Freed expansion, the LACC's landmark. “Los Angeles Convention Center Tower” by Alan Dean, CC BY 2.0. Source
The original Los Angeles Convention Center facade in October 1983, its marquee announcing the Society of Motion Picture and Television Engineers
The original 1971 building in October 1983, its marquee announcing the SMPTE conference. “Los Angeles Convention Center - Oct., 1983” by Jay Phagan, CC BY 2.0. Source
An LA Auto Show banner on the LACC's glass tower, with white tents on the plaza in front
LA Auto Show week at the glass-tower entrance, with tents on the plaza. “Los Angeles Convention Center” by AndrewGorden, CC BY 2.0. Source
Looking up into the white steel lattice and glass roof of the LACC entrance rotunda
The white steel and glass roof of the entrance rotunda. “Los Angeles Convention Center” by CG Hughes, CC BY-SA 2.0. Source
  1. 1971The center, designed by architect Charles Luckman, opens on the southwest edge of downtown Los Angeles.
  2. 1981–1997Expansions in 1981, 1993 and 1997 grow the campus: a North Hall, then South Hall and the James Ingo Freed annex of green glass and white steel, then the 162,000 sq ft Kentia Hall below South Hall.
  3. 1983A tornado strikes downtown on March 1, damaging the roof and upper-level panels. Repairs and new lettering cost $3 million.
  4. 1984The LACC is the Main Press Center for the 1984 Summer Olympics.
  5. Late 1990sThe northeast part of the campus, the North Hall, is demolished to make way for Staples Center, now Crypto.com Arena.
  6. 2008On September 15, the LACC becomes the first convention center in the U.S. to earn LEED certification for Existing Buildings.
  7. 2010–2015AEG and Casey Wasserman propose Farmers Field, a $1 billion stadium and convention center plan. It is abandoned in March 2015.
  8. 2025–2029The City Council approves the $2.62 billion expansion in September 2025 and work starts October 1. The LACC is planned to host fencing, taekwondo, table tennis, judo and wrestling at the 2028 Olympics.

Photos: "Los Angeles Convention Center" by Gage Skidmore, CC BY-SA 2.0 Source · "AX - hall" by digitizedchaos, CC BY 2.0 Source · "LA Auto Show 2012" by Neon Tommy, CC BY-SA 2.0 Source

Floor plan & exhibit halls

Los Angeles Convention Center floor plan: the exhibit halls and the Olympic expansion

Five exhibit halls make up today's 720,000 sq ft. The two big ones stand on either side of Pico Boulevard: West Hall (Halls A and B) and South Hall (Halls G, H, J and K), with Kentia Hall one level below South Hall. Petree Hall and Concourse Hall add smaller, 17 ft spaces. The expansion now under construction builds new hall space above Pico to join West and South into one contiguous floor of more than 750,000 sq ft.

Los Angeles Convention Center exhibit halls: West Hall, South Hall and Kentia Hall (schematic, not to scale)Schematic of the Los Angeles Convention Center exhibit halls. West Hall, 210,685 sq ft, 36 ft ceiling, booths up to 33 ft (22 ft under the rear soffit), divides into Hall A, 147,506 sq ft, 342 by 363 ft, 715 ten-by-ten booths, and Hall B, 63,619 sq ft, 342 by 194 ft, 300 booths. South Hall, 346,890 sq ft, 40 ft ceiling, booths up to 36 ft, divides into Halls G and K, each 96,660 sq ft, 300 by 360 ft, 490 booths, and Halls H and J, each 76,785 sq ft, 180 by 360 to 460 ft, 420 booths; all four together hold 1,720 booths. Kentia Hall, 162,000 sq ft on the lower level below South Halls H and J, 18 ft minimum ceiling, booths up to 16 ft, 844 ten-by-ten and 64 eight-by-ten booths. West Hall and South Hall stand on either side of Pico Boulevard; the expansion under construction adds about 190,000 sq ft of exhibit space above Pico to join them, with substantial completion targeted for spring 2028. Petree Hall, 21,557 sq ft, 17 ft, 115 booths. Concourse Hall, 26,342 sq ft, 17 ft, up to eight rooms, 135 booths. 64 meeting rooms. Pico Boulevard between Figueroa Street and LA Live Way is closed from December 4, 2025 to March 31, 2028.SIDE VIEW · CEILING AND MAXIMUM BOOTH HEIGHTSCHEMATIC, NOT TO SCALE36 ftWest Hall A–Bbooths to 33 ft17 ftPetree Hall17 ftConcourse Hall40 ftSouth Hall G–Kbooths to 36 ft18 ftKentia Hallmin · booths 16 ftPLAN · LEVEL ONE EXHIBIT HALLSA147,506 sq ft342′ × 363′715 booths36 ftB63,619 sq ft342′ × 194′300 booths36 ftWEST HALL · A + B = 210,685 sq ft · 1,050 boothsPICO BLVDExpansionabove Pico+190,000sq ftbuilding tospring 2028G96,660sq ft490 booths40 ftH76,785sq ft420 booths40 ftJ76,785sq ft420 booths40 ftK96,660sq ft490 booths40 ftSOUTH HALL · G to K = 346,890 sq ft · 1,720 boothsLOWER LEVEL · BELOW H AND JKentia Hall · 162,000 sq ft360′ × 460′ · 844 + 64 booths18 ft minimum · booths to 16 ftOTHER EXHIBIT SPACE · LOCATIONS NOT DRAWNPetree HallC + D · 21,557 sq ft17 ft · 115 boothsC 9,462 · D 11,926 sq ftConcourse HallRooms 150–153 · 26,342 sq ft17 ft · 135 boothsUp to eight rooms64 meeting rooms300 series · South Hall400 series · Concourse13 ft 9 in in the 300sKentia Hall freightPast show kits: Kentiaexhibitors check in atthe Kentia docksGETTING IN WHILE THE EXPANSION IS BUILTPico Blvd closedFigueroa to LA Live Way24/7, Dec 4, 2025 toMar 31, 2028GaragesWest Hall, South Halland Venice garagesFlat $35–$45 per dayMetro railPico stationA and E LinesAbout an 8-minute walkMarshaling yardSet by the show contractorPast LA Auto Shows:Dodger Stadium lots Los Angeles Convention Center exhibit halls: West Hall, South Hall and Kentia Hall (schematic, not to scale)Schematic of the Los Angeles Convention Center exhibit halls. West Hall, 210,685 sq ft, 36 ft ceiling, booths up to 33 ft (22 ft under the rear soffit), divides into Hall A, 147,506 sq ft, 342 by 363 ft, 715 ten-by-ten booths, and Hall B, 63,619 sq ft, 342 by 194 ft, 300 booths. South Hall, 346,890 sq ft, 40 ft ceiling, booths up to 36 ft, divides into Halls G and K, each 96,660 sq ft, 300 by 360 ft, 490 booths, and Halls H and J, each 76,785 sq ft, 180 by 360 to 460 ft, 420 booths; all four together hold 1,720 booths. Kentia Hall, 162,000 sq ft on the lower level below South Halls H and J, 18 ft minimum ceiling, booths up to 16 ft, 844 ten-by-ten and 64 eight-by-ten booths. West Hall and South Hall stand on either side of Pico Boulevard; the expansion under construction adds about 190,000 sq ft of exhibit space above Pico to join them, with substantial completion targeted for spring 2028. Petree Hall, 21,557 sq ft, 17 ft, 115 booths. Concourse Hall, 26,342 sq ft, 17 ft, up to eight rooms, 135 booths. 64 meeting rooms. Pico Boulevard between Figueroa Street and LA Live Way is closed from December 4, 2025 to March 31, 2028.PLAN · LEVEL ONESCHEMATIC, NOT TO SCALEWEST HALL · 210,685 SQ FT · BOOTHS TO 33 FTA147,506 sq ft342′ × 363′ · 715 booths36 ftceilingB63,619 sq ft342′ × 194′ · 300 booths36 ftceilingPICO BLVD · EXPANSION ABOVE IT+190,000 sq ft joins West and South HallsSubstantial completion targeted spring 2028SOUTH HALL · 346,890 SQ FT · BOOTHS TO 36 FTG96,660 sq ft490 booths40 ftceilingH76,785 sq ft420 booths40 ftceilingJ76,785 sq ft420 booths40 ftceilingK96,660 sq ft490 booths40 ftceilingLOWER LEVEL · BELOW H AND JKentia Hall · 162,000 sq ft18 ft min · booths to 16 ft · 844 + 64 boothsOTHER SPACE AND ACCESSPetree Hall21,557 sq ft · 17 ft115 boothsConcourse Hall26,342 sq ft · 17 ft135 boothsPico Blvd closedFigueroa–LA Live Wayto Mar 31, 2028Metro Pico stationA and E Lines≈ 8-minute walkGaragesWest Hall · South HallVenice · $35–$45Marshaling yardSet per showby the contractor
  • Movable wall
  • 36 ft ceiling or more
  • Under construction or lower level

Schematic, not to scale: hall sizes, ceilings and booth counts come from the center's Floorplans and Specifications brochure, and maximum booth heights from its planner FAQ. Compass direction, docks, ramps and the exact places of Petree Hall and Concourse Hall are not drawn. Official floor plans, the brochure and interactive plans are on laconventioncenter.com.

Recent and upcoming show floor plans

Official floor plans from organizers of shows at the LACC. Every show draws its own layout, aisles and booth numbers, and during the expansion the halls in use can change from year to year, so use these to see how a real show fills the building, then work from your own show's plan.

Links go to the organizers' floor-plan systems (MapYourShow, Map Dynamics, Conference Harvester) and open outside this site. Checked October 16, 2026; plans change as booths sell.

LACC exhibit halls, hall by hall
HallFloor areaSizeCeiling10×10 boothsMax booth height
West Hall A147,506 sq ft342′ × 363′36 ft71533 ft (22 ft at rear soffit)
West Hall B63,619 sq ft342′ × 194′36 ft30033 ft (22 ft at rear soffit)
South Hall G96,660 sq ft300′ × 360′40 ft49036 ft
South Hall H76,785 sq ft180′ × 360–460′40 ft42036 ft
South Hall J76,785 sq ft180′ × 360–460′40 ft42036 ft
South Hall K96,660 sq ft300′ × 360′40 ft49036 ft
Kentia Hall162,000 sq ft360′ × 460′18 ft min844 + 64 (8×10)16 ft
Petree Hall C + D21,557 sq ft194′ × 112′17 ft115Ceiling minus 3 ft*
Concourse Hall26,342 sq ft230′ × 109–117′17 ft135Ceiling minus 3 ft*
  • West A + B210,685 sq ft · 1,050 booths · 36 ft
  • South G + H173,445 sq ft · 880 booths
  • South H + J153,570 sq ft · 840 booths
  • South G to J250,230 sq ft · 1,371 booths
  • South G to K346,890 sq ft · 1,720 booths · 40 ft

Kentia Hall sits below South Halls H and J. Petree Hall splits into C (9,462 sq ft) and D (11,926 sq ft); Concourse Hall into up to eight rooms (150 to 153). *The center sets meeting-room booth heights at ceiling height minus 3 ft; ask your event manager how that applies to Petree and Concourse. Source: LACC Floorplans and Specifications brochure and planner FAQ.

346,890sq ft in South Hall (G, H, J, K), column-free, polished concrete, divisible into up to three spaces
210,685sq ft in West Hall (A and B), column-free; the West Hall annex of green glass and white steel is by James Ingo Freed
162,000sq ft in Kentia Hall, on the lower level below South Halls H and J
64meeting rooms, including the 300 series in South Hall and the 400 series along the concourse
Gilbert Lindsay Plazathe plaza in front of the center, used for registration and sponsor activations; confirm plaza access during construction

Loading dock & move-in

Los Angeles Convention Center loading dock and freight countdown for an LACC show

Get directions to Los Angeles Convention Center →

  • Marshaling yardTrucks usually check in at an off-site yard set by the show contractor and are then called to a dock. For the LA Auto Show in 2017 to 2019, GES used Dodger Stadium Lots 13 and 14; inbound loads needed a certified weight ticket and bill of lading.
  • Kentia HallPast show kits sent Kentia Hall exhibitors straight to the Kentia docks instead of the marshaling yard. Kentia sits one level below South Hall.
  • West HallAn Exhibitor Online venue profile notes West Hall has only one freight ramp, which can slow loading. Ask for your dock slot early.
  • Pico BoulevardClosed around the clock between Figueroa Street and LA Live Way from December 4, 2025 to March 31, 2028 for the expansion. Plan truck and van routes around it.
  • Hand-carryAt past LACC shows the Teamsters claimed material handling; you could hand-carry what one person can carry in one trip, without dollies or hand trucks.
  • ParkingWest Hall, South Hall and Venice garages; flat rates of $35 to $45 depending on event and location, generally 5 a.m. to 9 p.m.
  1. Day −60Design approved. Confirm your hall and its height limit (36 ft South, 33 ft West, 16 ft Kentia) and order electrical and rigging.
  2. Day −45Booth over 12 ft, stairs or a covered area? Engineering plans and the Fire Department permit go through show management.
  3. Day −30EAC form and certificate of insurance filed with show management.
  4. Day −14Purple ships to Los Angeles from New York through our carrier network, to the advance warehouse or the show site.
  5. Day −7Advance warehouse deadline. Late freight pays the surcharge.
  6. Day 0Check in at the marshaling yard, then to your dock slot. Union crew starts on straight time.
  7. Show +1Move-out. Empties return, the material handling agreement is turned in and freight is routed home.

The labor map

Los Angeles Convention Center labor: who sets up my booth?

California is not a right-to-work state, and the LACC runs a fully union floor. The trades split the work: Decorators Local 831 builds exhibits, Riggers Local 831 hangs them, the Teamsters move freight and the IBEW wires power. The rules below come from GES work rules for past LACC shows; your show's official contractor publishes the current ones in the kit.

✓Your own team

  • Set up a display one person can finish in under half an hour, without tools
  • Work one to one alongside a union installer, if you are a permanent employee of the exhibiting company
  • Unpack and place your own products and literature
  • Hand-carry what one person can carry in one trip, without dollies or hand trucks
  • Plug 120-volt equipment into the outlets you ordered
  • Hire an exhibitor-appointed contractor (EAC), filed with show management

●Union trades and exclusives

  • Decorators Local 831: exhibit setup and dismantling, signs, carpet, attaching lighting, ground-supported LED walls
  • Riggers Local 831: truss, hoists, speakers, LED walls and signs hung overhead
  • Teamsters: unloading, forklifts and other equipment, empty containers
  • IBEW: hard-wiring, and plugging in anything over 120 volts
  • Boldyn Networks: exclusive internet and telecommunications
  • Taste Los Angeles by Levy: exclusive food and beverage, including sampling

!Plan for

  • Four-hour minimum calls for most unions
  • Tipping any worker, in cash, product or gifts, is not allowed
  • Booths over 12 ft, or stairs over 30 in, need a wet-stamped engineering plan
  • Covered areas of 750 sq ft or more need automatic sprinklers
  • Food or drink sampling needs written permission from the center's Food Services Division
  • EAC paperwork and insurance certificates due by the kit's deadline; Purple coordinates crews and freight for LACC shows

Sources: GES work rules for the 2017 LA Auto Show at the LACC; Exhibitor Online venue profile; LACC planner FAQ and event resources. Rules change by show and contract year: your show kit has the final word.

Background photo: "LA Auto Show 2012" by Neon Tommy, CC BY-SA 2.0 Source

Free tool · plan your Los Angeles budget

LACC drayage estimator: Los Angeles Convention Center show budget

Pick a booth size and type to get planning numbers for shipping weight, drayage at about $175 per hundredweight, and installation and dismantling (I&D) labor. Every number is a Purple planning estimate for 2026 and 2027, not a quote: the center publishes no drayage or labor rate, and your show's official contractor carries the actual tariff in the exhibitor kit. Compare venues and read the glossary on the drayage rates page.

Booth size
Booth type

The fields below fill in from size and type. Change any of them.

Packaging

Purple planning estimate · not a quote

Drayage + I&D labor, Los Angeles

$5,360 – $8,950
Shipping weight planning estimate
1,800 lbs
Drayage planning estimate
$3,150
I&D labor hours planning estimate
16 – 28 hrs
I&D labor planning estimate
$2,210 – $5,800

18 cwt at $175 per 100 lbs. Labor at $138–$207 per hour, straight time.

Get a real Los Angeles quote

How these planning numbers work

  • Shipping weight: about 6 lbs per sq ft for a rental booth, 9 for custom or hybrid, 12 for fully custom, crated, with graphics and furniture.
  • Drayage: $175 per 100 lbs (cwt), Purple's Los Angeles planning rate, with a 200 lb minimum. Loose or pad-wrapped freight adds 30%.
  • I&D labor hours: install plus dismantle, 0.06–0.10 person-hours per sq ft for rental, 0.08–0.14 for custom or hybrid, 0.12–0.20 for fully custom.
  • Labor rate: $138–$207 per person-hour, straight time, a planning range from published 2026 show labor rates elsewhere. No Los Angeles rate is published, and overtime costs more.
  • Own staff: only if this venue's rules and your show kit let your own full-time staff set up (see the labor section above). Then, I&D labor drops to $0 here.
  • Not included: booth space, the exhibit itself, freight to Los Angeles, power and internet orders, rigging, travel and tax.

LACC notes: the floor is fully union and California is not right-to-work, so plan for union I&D on anything beyond a half-hour, no-tools setup. Late freight to the advance warehouse, and freight that misses its target window at the show, usually pays a surcharge in the kit. Overtime and weekend move-ins cost more than these straight-time numbers.

The 2012 LA Auto Show floor at the Los Angeles Convention Center seen through the windshield of a display car

On the floor at the 2012 LA Auto Show

The LA Auto Show is the LACC's biggest week of the year; this is the 2012 floor from the driver's seat of a display car.

Photo: "LA Auto Show 2012" by Neon Tommy, CC BY-SA 2.0 Source

The calendar

Los Angeles Convention Center events 2026–2027: trade and consumer shows at the LACC

The LA Auto Show is the building's marquee event; the rest of the calendar mixes construction, optics and medical trade shows with art, fitness and pop-culture shows. Confirm dates, halls and contractor with each organizer, especially while the expansion is under way.

Dates from the LACC event calendar and event pages (L.A. Comic Con, Build Expo, LA Art Show) and from the organizers (LA Auto Show press release, thefitexpo.com, ofcconference.org). Healthcare and professional meetings fill the fall too: the AAO-HNSF Annual Meeting & OTO EXPO ran October 17–20, 2026 and the NMSDC Annual Conference & Exchange October 25–28, 2026. Anime Expo has been reported for July 2–5, 2027, but we could not confirm it with the organizer, so it is not listed. The LA Auto Show draws the building's biggest crowds; ask the organizer for current attendance.

Where to stay & getting there

Hotels near Los Angeles Convention Center: transit and crew logistics

The closest hotels sit across Figueroa Street and around L.A. LIVE, a few minutes' walk from the halls. The center names no hotel as connected to it. Metro's A and E Lines stop at Pico station, about an 8-minute walk away.

Hotels near the Los Angeles Convention Center, plotted by straight-line distance and directionMap centred on the Los Angeles Convention Center (the venue map point from Wikipedia coordinates), north up, distance rings at 0.25 and 0.5 miles. 1. Moxy and AC Hotel Downtown Los Angeles: about 0.19 miles northeast. 2. JW Marriott and The Ritz-Carlton, Los Angeles L.A. LIVE: about 0.44 miles northeast. 3. Luxe City Center Hotel: about 0.47 miles northeast. 4. Courtyard and Residence Inn Los Angeles L.A. LIVE: about 0.49 miles northeast. 5. Hotel Figueroa: about 0.54 miles northeast. 6. Hotel Indigo Los Angeles Downtown: about 0.62 miles northeast. Positions are from OpenStreetMap coordinates; streets and walking routes are not drawn.0.25 miN00.25 mi≈ 1320 ftSTRAIGHT-LINENOT A ROUTELACCmap point1Moxy + AC Hotel2JW Marriott / Ritz3Luxe4Courtyard / Residence Inn5Hotel Figueroa6Hotel Indigo
Straight-line positions from OpenStreetMap; walking routes and streets are not drawn.
Nearby hotels, closest first
Map numberHotelRoomsLink to centerStraight-lineWalk (est.)
1Moxy and AC Hotel Downtown Los Angeles1260 South Figueroa Street727Not stated0.19 mi1,020 ft≈ 5 min
2JW Marriott and The Ritz-Carlton, Los Angeles L.A. LIVE900 West Olympic Boulevard1,001Not stated0.44 mi2,330 ft≈ 11 min
3Luxe City Center Hotel1020 South Figueroa Street—Not stated0.47 mi2,460 ft≈ 12 min
4Courtyard and Residence Inn Los Angeles L.A. LIVE901 West Olympic Boulevard—Not stated0.49 mi2,590 ft≈ 13 min
5Hotel Figueroa939 South Figueroa Street—Not stated0.54 mi2,830 ft≈ 14 min
6Hotel Indigo Los Angeles Downtown899 Francisco Street—Not stated0.62 mi3,270 ft≈ 16 min

Distance: straight line from the venue's map point (Wikipedia coordinates), so the hall door you use may be closer or farther. Walk: an estimate, straight-line, at 20 minutes a mile plus 30% for streets; not a measured route, and Pico Boulevard is closed between Figueroa Street and LA Live Way until March 31, 2028. "Not stated": the venue names no hotel as connected to the halls. Rooms: Exhibitor Online (JW Marriott 878 plus Ritz-Carlton 123, one tower) and Sunset (Moxy and AC, 727 together); "—" where we found no source.

Two blocks

JW Marriott and Ritz-Carlton, L.A. LIVE

One tower at 900 West Olympic Boulevard with 878 JW Marriott rooms and 123 Ritz-Carlton rooms, the closest full-service towers to the campus.

Across Figueroa

Moxy and AC Hotel Downtown LA

727 rooms in one building at 1260 South Figueroa Street, directly across the street from the convention center.

10 to 15-min walk

Downtown LA hotels

A range of price points along Figueroa and in South Park and the Financial District, near Metro rail.

≈ 8-min walk

Metro Pico station

A Line and E Line trains. 7th St/Metro Center, with the B and D Lines too, is 10 to 15 minutes on foot. DASH route F runs along Figueroa.

~20 mi

LAX airport

About 20 miles away, 20 to 30 minutes or more depending on traffic. Burbank is a smaller, often faster choice from the north. By car, I-110 and I-10 both reach downtown.

Crew logistics: budget real time and cost for parking and traffic, for both crew arrival and attendee flow. Purple coordinates crews and freight for LACC shows and ships and installs from New York.

Insider tips

Los Angeles Convention Center exhibitor tips: what experienced teams do

Halls

Tall booths belong in South Hall

South Hall allows booths up to 36 ft, West Hall 33 ft and only 22 ft under its rear soffit, and Kentia Hall 16 ft. Check your booth number against the soffit before you design a tall structure in West Hall.

Construction

Route around Pico Boulevard

Pico is closed between Figueroa Street and LA Live Way until March 31, 2028. Give your driver and crew the show's current truck route and drop-off point, not an old one.

Labor

Design for the half-hour rule

Past LACC rules let one person set up without tools in under 30 minutes. A pop-up or tabletop display that fits that window can save a four-hour minimum labor call.

Permits

Engineer anything over 12 ft

Booths over 12 ft tall, or stairs over 30 in, need a wet-stamped engineering plan, and covered areas of 750 sq ft or more need sprinklers. Start these early: LAFD review takes time.

Kentia

Kentia has its own docks

At past shows, Kentia Hall exhibitors checked in at the Kentia docks rather than the off-site marshaling yard. Ask your contractor whether that still applies to your show.

Travel

Take the A or E Line

Pico station is about an 8-minute walk, and garages charge a flat $35 to $45. Staff who stay downtown can skip the parking and the traffic.

Rules of the floor

Los Angeles Convention Center rules of the floor

The short list of building rules that change a booth plan or a budget at the LACC.

Labor

Union building, Local 831

California has no right-to-work law. Booth labor, drayage, rigging and decorating are union work through the show's official contractor.

Drayage

West Coast union rates

Plan about $175 per hundredweight, with a 200 lb minimum and surcharges for uncrated, late or off-target and special-handling freight.

Construction

Confirm hall availability

With new hall space going up over Pico Boulevard until 2028, confirm your hall, dock and entrance before you finalize the floor plan.

Fire code

Los Angeles Fire Department

The center's Fire Inspector reviews show floor plans for LAFD code. Covered areas of 750 sq ft or more need automatic sprinklers; use flame-certified fabrics for anything covered.

Exclusives

Center-exclusive services

Internet and telecommunications go through Boldyn Networks and food and beverage through Taste Los Angeles. Your show kit lists electrical, rigging and cleaning providers.

Move-out

Empties and the MHA

Put EMPTY stickers on crates as you unpack and turn in the material handling agreement before you leave. Purple routes the booth back to storage or on to your next show.

FAQ

Los Angeles Convention Center FAQ for exhibitors

Is the LACC open during the Olympic expansion?

Yes. The builders say the center stays fully operational through the $2.62 billion project. Pico Boulevard between Figueroa Street and LA Live Way is closed until March 31, 2028, and LA28 uses the building from June to August 2028, so confirm your hall, dock and entrance before you book.

Can I set up my own booth?

Only small jobs. At past LACC shows, one person could set up without tools in under half an hour; anything more needed union installers, with your permanent staff allowed to work alongside them one to one. Confirm the current rule in your show kit.

Is the Los Angeles Convention Center union?

Yes. California is not a right-to-work state and the LACC runs a fully union floor: Decorators and Riggers Local 831, the Teamsters and the IBEW have claimed exhibit, rigging, freight and electrical work at past shows.

How much is drayage?

Purple's planning estimate is about $175 per hundredweight in 2026 and 2027, with a 200-pound minimum and standard surcharges. The actual tariff is in your show's exhibitor kit.

How big is the LACC?

About 867,000 square feet of event space, including 720,000 square feet in five exhibit halls and 64 meeting rooms. The expansion adds about 190,000 square feet of exhibit space above Pico Boulevard by 2028.

What is the ceiling height in the exhibit halls?

40 ft in South Hall, 36 ft in West Hall, 17 ft in Petree and Concourse Halls and at least 18 ft in Kentia Hall. Booths may go up to 36 ft in South Hall, 33 ft in West Hall (22 ft at the rear soffit) and 16 ft in Kentia Hall.

What happens at the LACC during the 2028 Olympics?

The current LA28 venue plan puts fencing, taekwondo, table tennis, judo and wrestling at the LACC, plus Paralympic events. It is the second time the building plays a major role in an LA Olympics, after serving as the Main Press Center in 1984.

Which airport should I use?

LAX is about 20 miles away, 20 to 30 minutes or more depending on traffic. Burbank is a smaller, often faster alternative if you are coming from the north.

Is there Metro rail access?

Yes. The Metro A and E Lines stop at Pico station, about an 8-minute walk from the center. 7th St/Metro Center is 10 to 15 minutes on foot.

How much is parking at the LACC?

The West Hall and South Hall garages charge flat rates of $35 to $45, depending on the event and location, generally from 5 a.m. to 9 p.m. There are 24 EV charging stations, a number that may change during construction.

Where does Purple ship from for LACC shows?

Purple ships and installs from New York and coordinates crews and freight for Los Angeles Convention Center shows.

What happened to North Hall?

The northeast part of the campus, the North Hall, was demolished in the late 1990s to make way for Staples Center, now Crypto.com Arena.

Exhibiting at the LACC?

South Hall, West Hall or Kentia?

Send us the show, hall and booth number. Within two business days you get a union-labor briefing, a design sized to your hall's height limit, a drayage estimate at Los Angeles rates and a move-in plan that works around the construction.

Background photo: "Downtown Los Angeles at night" by nemandzax, CC BY 2.0 Source

Compare venues

Los Angeles Convention Center vs other major U.S. convention centers

How the Los Angeles Convention Center stacks up against other major U.S. convention centers. Drayage figures are Purple planning rates, not published tariffs.

VenueTypeLargest spaceCeilingLaborDrayage (plan)Airport
Los Angeles Convention CenterThis guideConvention center346,890 sq ft South Hall G–K40 ft South · 36 ft WestUnion · check kit≈ $175/cwtLAX · ~20 mi
America's Center Convention ComplexSt. LouisConvention center574,000 sq ft contiguous, with Dome floor40 ftUnion · 300 sq ft rule≈ $150/cwtSTL · 14 mi
Anaheim Convention CenterAnaheimConvention center221,284 sq ft Hall D25 ft Hall D · 13 ft 8 in Hall EUnion · check kit≈ $172/cwtSNA · 13 mi
Austin Convention CenterAustinConvention center (closed, rebuilding)Closed · 620,000 sq ft rentable from 2029—Right-to-work · venue closed≈ $100/cwtAUS · ~5 mi
Boston Convention & Exhibition CenterBostonConvention center516,000 sq ft contiguous (Halls A–C)35 ft low · up to 100 ftUnion · staff setup OK≈ $324/cwtBOS · 3 mi
Calvin L. Rampton Salt Palace Convention CenterSalt Lake CityConvention center515,000 sq ft contiguous, 10 halls30 ftRight-to-work≈ $120/cwtSLC · ~6 mi
Charlotte Convention CenterCharlotteConvention center280,000 sq ft contiguous, Halls A–C30 ft listed maxRight-to-work≈ $115/cwtCLT · 7 mi
Colorado Convention CenterDenverConvention center584,000 sq ft on one level, Halls A–F30 ft to low steelIATSE 7 · 60-min rule≈ $160/cwtDEN · 30–40 min
Ernest N. Morial Convention CenterNew OrleansConvention center127,364 sq ft Hall E · 1.1M sq ft in all—Right-to-work≈ $155/cwtMSY · 25–30 min
Fontainebleau Las VegasLas VegasResort ballrooms105,264 sq ft Royal Ballroom28 ft 10 inUnion · check kit≈ $185/cwtLAS · 4.3 mi
Gaylord Pacific Resort & Convention CenterChula VistaResort ballrooms140,049 sq ft California Exhibit Hall34 ft hall · 27–28 ft ballroomsCheck show kit≈ $176/cwtSAN · ~10–12 mi
George R. Brown Convention CenterHoustonConvention center547,730 sq ft contiguous, Halls A–E35 ft (Level 1) · 30 ft (Level 3)Right-to-work · check kit≈ $95/cwtHOU · ~9 mi
Georgia World Congress CenterAtlantaConvention center1M+ sq ft contiguous (Halls B, BC, C)30 ft to gridRight-to-work≈ $150/cwtATL · 15–20 min
Hilton AnatoleDallasHotel ballrooms73,000–75,900 sq ft Trinity Exhibit Hall18 ft hall · 28–29 ft ballroomsRight-to-work · check kit≈ $100/cwtDAL · ~4 mi
Hilton New Orleans RiversideNew OrleansHotel ballrooms26,894 sq ft Grand Ballroom18 ft Grand Ballroom · 12 ft Grand SalonRight-to-work · check kit≈ $155/cwtMSY · ~25 min
Hilton OrlandoOrlandoHotel ballrooms48,167 sq ft Orlando Ballroom26 ft Orlando · 24 ft Orange · 18 ft FloridaRight-to-work≈ $155/cwtMCO · 11 mi
Huntington PlaceDetroitConvention center623,000 sq ft contiguous, Halls A–D30 ft (A–D) · 18 ft 8 in (E)Union · 400 sq ft rule≈ $155/cwtDTW · 20 mi
Hyatt Regency OrlandoOrlandoHotel ballrooms54,638 sq ft Regency Ballroom31 ft Regency (listed) · 21 ft PlazaRight-to-work≈ $155/cwtMCO · 12 mi
Indiana Convention CenterIndianapolisConvention center566,600 sq ft contiguous, Halls A–K35 ftUnion · own staff OK≈ $135/cwtIND · ~15 min
Iowa Events CenterDes MoinesConvention center150,000 sq ft contiguous, EMC Expo Center Halls A–C35 ft (Halls B–C)Right-to-work≈ $100/cwtDSM · ~10 min
Javits CenterNew YorkConvention center~500,000 sq ft contiguous (Level 3)Varies by hall · check planUnion · 250 sq ft rule≈ $195/cwtEWR / LGA / JFK · 45–70 min
Kansas City Convention CenterKansas CityConvention center388,800 sq ft column-free, Bartle Hall A–E33 ft A–C · 42 ft D–EIATSE 31 · check kit≈ $145/cwtMCI · ~19 mi
Kay Bailey Hutchison Convention Center DallasDallasConvention center304,250 sq ft open in Halls A–C (2026)35 ft (A, B) · 31–37 ft (C)Right-to-work · check kit≈ $100/cwtDAL · ~6 mi
Manchester Grand Hyatt San DiegoSan DiegoHotel ballrooms34,000 sq ft Grand Hall~14 ft Grand Hall · 18–21 ft ballroomsUnion dock · check kit≈ $176/cwtSAN · 3 mi
Marriott Marquis San Diego MarinaSan DiegoHotel ballrooms35,631 sq ft Marriott Grand and Pacific ballrooms26 ft Grand · 16 ft PacificUnion · check kit≈ $176/cwtSAN · 3 mi
McCormick PlaceChicagoConvention center840,000 sq ft Hall A (South) · 1.2M+ on one levelVaries by hall · check planUnion · staff setup any size≈ $210/cwtMDW · ~20 min
Miami Beach Convention CenterMiami BeachConvention center491,654 sq ft contiguous, Halls A–D—Union · IATSE/IBEW · check kit≈ $170/cwtMIA · ~12 mi
Minneapolis Convention CenterMinneapolisConvention center376,200 sq ft contiguous, Halls B–E30 ft 6 in to truss · 85 ft domesUnion · open dock≈ $150/cwtMSP · ~20 min
Moscone CenterSan FranciscoConvention center502,440 sq ft contiguous, Halls A–F37 ft Halls A–C · 28 ft Hall FUnion · check kit≈ $180/cwtSFO · 25–40 min
Oklahoma City Convention CenterOklahoma CityConvention center200,730 sq ft continuous, up to 4 halls30 ftRight-to-work≈ $105/cwtOKC · ~9–10 mi
Orange County Convention CenterOrlandoConvention center1,103,538 sq ft West Building30–40 ftRight-to-work≈ $155/cwtMCO · 12 mi
Oregon Convention CenterPortlandConvention center255,000 sq ft Halls A–E30 ftUnion · check kit≈ $150/cwtPDX · MAX ~30 min
Phoenix Convention CenterPhoenixConvention center312,500 sq ft contiguous, lower Halls 1–632 ft lower · 35 ft upperRight-to-work · check kit≈ $140/cwtPHX · ~3 mi
Reliant CenterHoustonConvention center706,000+ sq ft on one level, Halls A–E25–60 ft · avg 30 ftRight-to-work · check kit≈ $116/cwtHOU · ~8 mi
Rosen Centre HotelOrlandoHotel ballrooms35,000 sq ft Grand Ballroom25 ft Grand · 22 ft Executive, JuniorRight-to-work≈ $155/cwtMCO · 12 min
San Diego Convention CenterSan DiegoConvention center525,701 sq ft contiguous, Halls A–H27 ft 4 in A–E · up to 64 ft F–HUnion · check kit≈ $176/cwtSAN · 3 mi
San Jose McEnery Convention CenterSan JoseConvention center143,000 sq ft Halls 1–332 ftUnion · 30 min / 10 ft rule≈ $160/cwtSJC · 4 mi
Santa Clara Convention CenterSanta ClaraConvention center90,014 sq ft Halls A–D28 ft 6 inUnion · check kit≈ $160/cwtSJC · 5–6 mi
Seattle Convention CenterSeattleConvention center205,700 sq ft Arch Halls 4A–4F25 ft Arch · 30 ft SummitUnion · check kit≈ $165/cwtSEA · Link ~40 min
Sheraton Grand Chicago RiverwalkChicagoHotel ballrooms40,003 sq ft ballroom · 35,000 sq ft Riverwalk hall22 ft ballroom · 10 ft 6 in hallUnion · pop-ups ≤ 10×10≈ $225/cwtMDW · 13 mi
Signia by Hilton Orlando Bonnet CreekOrlandoResort ballrooms35,925 sq ft Bonnet Creek Ballroom20 ft Bonnet Creek · 18 ft Waterside, FloridianRight-to-work≈ $155/cwtMCO · 19 mi
Walt Disney World Swan and DolphinLake Buena VistaResort ballrooms110,500 sq ft Atlantic + Pacific halls30 ft Atlantic · 25′8″ PacificRight-to-work≈ $155/cwtMCO · ~20 min
Walter E. Washington Convention CenterWashingtonConvention center473,000 sq ft contiguous, Halls A–C30 ft (A–C) · up to 52 ft (D–E)Union · check kit≈ $175/cwtDCA · ~4 mi

More California guides

Other California and major U.S. convention centers

All venue guides →

Written by the Purple Exhibits team. Reviewed for the 2026–2027 show season. Figures marked for verification are being confirmed with LACC event services given the ongoing construction. Sources: LACC website (exhibit halls, Floorplans and Specifications brochure, planner FAQ, event resources, Getting Here, event calendar and event pages), Populous, Skift Meetings and MyNewsLA reporting on the expansion, Wikipedia (Los Angeles Convention Center; Venues of the 2028 Summer Olympics and Paralympics), GES work rules and marshaling-yard pages for the LA Auto Show, Exhibitor Online, OpenStreetMap, Sunset, organizer sites for show dates, and the Library of Congress Prints & Photographs Division.